New to Dutch tenders?

Bidding from abroad

Read our step-by-step guide on registering with TenderNed and Mercell, ESPD requirements, language rules, and how the TenderView.ai AI assistant answers questions in your own language.

Read the guide

Public Tenders

Search 8,927 tenders from the Dutch government. Including AI summaries, deadlines and contact details.

ClosedwerkenEU

Repurposing Stadhuis Gouda

Gemeente Gouda12 nov 2024

The Municipality of Gouda intends to repurpose and make the iconic town hall on the Markt more sustainable. The project includes building and installation technical adjustments, asbestos removal, restoration of the west facade, stained-glass windows, and slate roofing. A heat pump will be installed to make the building gas-free, with a CO₂ reduction of at least 52%. Additionally, accessibility facilities will be expanded: a new lift, gender-inclusive toilets, and improved signage. The goal is to give the town hall a stronger social significance and strengthen the connection with the city, while preserving the monument.

Closedwerken

North-West Area - Adjusting considerations for Stoomtram Hoorn-Medemblik Z-170003

ProRail B.V.11 nov 2024

This tender from ProRail B.V. concerns the adjustment or consideration of works for the Stoomtram Hoorn-Medemblik (Z-170003). The procedure is a multiple reduced negotiated procedure, aimed at selecting a suitable contractor for a technically complex project within the railway network. The works include, among other things, adjusting infrastructure, ensuring safety, and minimizing disruptions to the current steam tram route. The contracting authority expects a detailed proposal with a realistic schedule, cost estimate, and a plan for quality and safety management. The selection criteria are based on experience, technical capacity, financial stability, and the ability to deliver within the specified timelines.

Closedwerken

Maintenance and sustainability of the city hall in Venlo

Gemeente Venlo11 nov 2024

The Municipality of Venlo is seeking a contractor for the maintenance and sustainability of the city hall. The project includes, among other things, structural maintenance (roof, facade, floors), technical maintenance (HVAC, electricity, plumbing), and energy-saving measures (insulation, solar panels, LED lighting, smart building management systems). The procurement is an open procedure for works, without a CPV code. The contracting authority expects an integrated approach with a clear project schedule, safety and quality management, and a focus on sustainability and energy efficiency. The contractor must have demonstrable experience with municipal buildings, knowledge of Dutch building and environmental legislation, and be capable of drafting a sustainability plan that meets the municipality's requirements.

Closedwerken

Area East - Arnhem reinforcement of supply cables OS D-003307

ProRail B.V.11 nov 2024

ProRail B.V. is conducting a multiple award procedure (ARN2016 Part III) to reinforce the supply cables in the Area East – Arnhem. The project concerns a works contract in which existing cables are reinforced or replaced to increase the reliability and capacity of the railway network. The tender focuses on technical quality, safety, environmental impact, and a clear delivery schedule. Suppliers must demonstrate experience with similar infrastructure and electrical projects, comply with Dutch regulations, and submit a detailed proposal describing materials, methods, timelines, and costs. The procedure is aimed at a rapid selection of suitable parties capable of delivering within the established frameworks.

AwardedwerkenEUMKB

31187282: Major maintenance A2 and A6 (2025, 2026)

Rijkswaterstaat is using a competitive dialogue light for major maintenance on the A2 and A6 in 2025‑2026. The project consists of two lots: A2 (31187282) and A6 (31203014). The works focus on replacing the asphalt surface course, repairing the binder course, maintenance of structures, vehicle barriers, and other infrastructure objects. Most tasks are repetitive, but there are exceptions: the widening of connection curve R at Knooppunt Oudenrijn (A2) and the replacement of six culverts (A6) require a final design. For the remaining scope, a detailed design is sufficient, making an Engineering & Construct (E&C) contract form appropriate. The procedure is a competitive dialogue light, aimed at finding an optimal execution and design solution.

ClosedwerkenEU

Renovation of office Gouda

Oasen N.V.10 nov 2024€ 11.000.000

Oasen N.V. intends to fully renovate the current office building in Gouda, including demolition, building, structural, and technical (electrotechnical, mechanical, and ICT) installations. The objective is to make the head office future-proof and ensure it aligns with the company's sustainability and organizational ambitions. The assignment requires an integrated approach in which safety, energy efficiency, digital infrastructure, and building quality are central. The tender is non-public, meaning a limited number of certified contractors may be approached. The project duration, budget, and delivery deadlines must be strictly adhered to, with a focus on minimal business disruption and maximum value creation.

AwardedwerkenEU

Contractor new construction Openbare Daltonschool Overschie

Stichting BOOR10 nov 2024

Stichting BOOR intends to realize replacement new construction for the Openbare Daltonschool Overschie in Rotterdam, including early childhood education and a gymnasium. The tender concerns a European non-open procedure for one bidder, focused on building, installation, and site works. The assignment is the full construction of a school building, including facilities for sports and education, with a focus on sustainable and accessible design criteria. The contracting authority is looking for a specialist with experience in school projects, knowledge of Dutch building regulations, and the ability to offer an integrated approach for architecture, engineering, and site development.

ClosedwerkenEU

WPB Lith Activated Carbon Filtration and Extraction (AKW)

Brabant Water NV9 nov 2024€ 6.500.000

Brabant Water NV intends to expand its water production facility in Lith with a new anaerobic activated carbon filtration system and a complete renovation of the water extraction wells. The project will be executed as a traditional 2-phase construction team: first a construction team phase in which the contracting authority and construction partner jointly develop a preliminary, final, and technical design, specifications, and budget; followed by a UAV phase for execution. The construction team phase requires an open budget, continuous evaluation, and room for innovative, sustainable solutions. The total target budget is between €5 million and €10 million, including the construction and realization phases, excluding risk and unforeseen costs. The bidder must offer a market-conform weighted hourly rate and maintain control over scope and costs from the outset. The assignment focuses on the robustness, efficiency, and future-proofing of the water production facility.

AwardedwerkenEU

ROK Maintenance of asphalt paving 2025-2028

Gemeente Ede9 nov 2024

The Municipality of Ede is conducting an open tender in 2025-2028 for the maintenance of asphalt paving. The contract includes small-scale and large-scale maintenance of roads and paths, including the removal and application of markings, the placement of verge concrete, and additional works. Small-scale reconstructions are permitted when the asphalt-related portion exceeds 50% of the sub-contract. The works are spread across the entire municipality, making logistics and planning crucial. The contracting authority expects a high level of quality, safety, and environmental friendliness, with clear requirements for materials, execution time, and reporting. The procedure is public, ensuring transparency and competition. The tender focuses on companies with experience in road maintenance, knowledge of local regulations, and the capacity to manage multiple sub-contracts simultaneously.

ClosedwerkenEU

Two-phase contract Noardburgum PB NB REN (new production plant)

Vitens N.V.9 nov 2024

Vitens N.V. has announced an open procedure for a two-phase contract for the construction of a new production plant Noardburgum (PB NB REN). The objective is a fully operational facility that provides the required capacity and quality of drinking water, with a completion date no later than 1 January 2030. The procurement concerns works only, without a specified CPV code, and focuses on a project with a clear timeline and performance requirements. The contracting authority expects a construction that meets strict water quality standards, sustainable construction practices, and efficient production capacity. The tender is public, allowing a wide range of contractors to participate. The focus is on realizing a modern, reliable water production infrastructure that aligns with future demand and regulations.

ClosedwerkenEU

Selection phase (re)construction Emmaschool in Assen

Stichting Plateau Openbaar Onderwijs Assen has initiated a selection phase for the (re)construction of the Emmaschool in Assen. The procedure is non-public and focuses on selecting a contractor capable of executing the entire construction project. The contracting authority expects an integrated approach in which design, construction, project management, and delivery align seamlessly. Key points of attention include compliance with Dutch building and safety standards, sustainability requirements, and a tight schedule that takes school activities into account. The client is looking for a partner with experience in school construction, who can respond flexibly to changing requirements and ensure good cooperation with the school community. The selection will be based on technical, financial, and organizational criteria, with an explicit focus on quality, innovation, and cost control.

AwardedwerkenEU

Sustainability of Anne de Vriesstraat location Assen

Stichting Regionaal Opleidingen Centrum Drenthe wishes to improve the sustainability of the building at Anne de Vriesstraat in Assen. The building, constructed in 2003, has a gross floor area of 13,430 m² and consists of several building sections connected via a central atrium. Since 2003, it has been fully utilized as an educational building with supporting offices. Many installations (Building Management System, central heating boiler, distribution pumps) are now 20 years old, fully depreciated, and fail regularly. The replacement of these installations is urgent to ensure the continuity of education and to reduce energy and maintenance costs. The assignment concerns works within an open procedure, aimed at modernizing and making the installations more sustainable, improving energy performance, and complying with current regulations regarding sustainability and safety.

Closedwerken

AT-2024-29 Sustainability of Asphalt Production

This project is a market consultation by Rijkswaterstaat and the Ministry of Climate and Green Growth aimed at the sustainability of asphalt production in the Netherlands. The goal is to develop a definitive approach that leads the sector towards stable, clean, and sustainable production until 2030. The consultation collects input from market parties to clarify the role of the government in stimulating investments and to provide clear steering instructions.

Awardedwerken

VBK3-Eilandspolder

Hoogheemraadschap Hollands Noorderkwartier has launched a non-public procedure for a work order to reinforce the dike of the Eilandspolder. The total length of the dike to be reinforced is approximately 8.5 km. The assignment focuses on improving structural integrity and increasing watertightness, so that the polder is better able to withstand flooding and current water management systems are supported. The works include, among other things, the installation of new dam materials, the reinforcement of existing dike structures, the installation of modern waterproofing systems, and ensuring compliance with national water legislation and safety standards. The execution must take place within a set timeframe, with minimal disruption to the surroundings and local infrastructure. The contracting authority expects a detailed project plan, a realistic schedule, a cost estimate, and clear quality assurance. The tender is aimed at specialized contractors with experience in water and dike works.

ClosedwerkenEU

SOK Installation and Maintenance of public lighting 2024-2032 Arnhem

De Connectie8 nov 2024€ 27.564.000

De Connectie is organizing a non-public tender for the installation and maintenance of public lighting in Arnhem for the period 2024-2032. The objective is a sustainable partnership with the municipality to modernize the lighting infrastructure, improve energy efficiency, and optimize maintenance processes. The assignment includes both the installation of new lighting systems (e.g., LED technology) and the maintenance and replacement of existing installations. The tender focuses on an integrated approach, centering on technological innovation, energy management, and environmental friendliness. The Municipality of Arnhem expects a long-term collaboration with a reliable partner experienced in large-scale lighting projects, knowledgeable about local regulations, and focused on sustainability.

ClosedwerkenEU

Redesign of Wilhelminasingel and bridge, St. Maartenslaan and Franciscus Romanusweg

The Municipality of Maastricht, in collaboration with Rijkswaterstaat, plans to launch a tender in December 2024 for the redesign and major maintenance of several road sections and the Wilhelminabrug. The works include traffic redesign, maintenance of bridge decks (steel and concrete), conservation of railings, replacement of steel and concrete decks, relocation of street lighting, and replacement of house and manhole connections. Execution is phased, without interruptions, starting on June 29, 2025, with a critical phase for the Wilhelminabrug until August 23, 2025. The award will be based on the most economically advantageous tender, in which price, quality, phasing, environmental management, and sustainability carry significant weight. The provider must have experience with bridge maintenance in urban environments and knowledge of system-oriented contract management.

Awardedwerken

Multi-year agreement Dredging works De Eem and Eemmond 2025-2027

Provincie Utrecht intends to enter into a multi-year agreement for the period 2025-2027 for dredging works on the river Eem. The assignment bundles both the preparatory work (such as soil investigation, permitting, and planning) and the executive works (dredging, transport, and processing of the spoil). The goal is to ensure continuity and efficiency, similar to the past three years. The procedure is non-public, meaning a limited number of pre-selected bidders will be invited. The contracting authority expects an integrated approach, in which the contractor is responsible for planning, execution, environmental management, safety measures, and reporting. The agreement is focused on quality, timely delivery, and compliance with laws and regulations.

Awardedwerken

Revitalization and New Construction KC Eigenwijze

Stichting Openbaar Primair Onderwijs IJmond (Stichting IJmare) intends to realize a combination of demolition, revitalization, and new construction for the housing of KC Eigenwijze. Approximately 880 m² of the existing buildings (360 m² building + 520 m² outbuilding) will be demolished, 738 m² will be revitalized, and 764 m² of new construction will be built. The final result is a cohesive building of approximately 1,502 m² GFA. The contracting authority asks the contractor to contribute ideas regarding the phasing of demolition and realization during the Bouwteam phase. The procedure is non-public, meaning a limited number of bidders will be invited. The assignment requires experience in combining demolition, revitalization, and new construction, knowledge of bouwteam methodologies, and the realization of school buildings.

ClosedwerkenEU

31201543: Reconstruction Knooppunt Amstel

This tender concerns the reconstruction of the Knooppunt Amstel, part of the Zuidasdok project, including the entrance and exit of the S109. The objective is to realize a main and parallel structure with extensive road and infrastructure works. The works include replacing an existing bridge and constructing two new bridges over the Amstel, earthworks, noise barriers, dynamic traffic management (DVM), public lighting, and adjustments to the underlying road network. The procedure is a competitive dialogue, aimed at finding innovative solutions for a complex traffic and infrastructure project in an urban environment.

AwardedwerkenMKB

Framework Agreement Repair Works utility trenches, cables and pipes 2025-2029

The Municipality of Sittard-Geleen requests repair works for cable and pipe trenches within its borders for the period 2025-2029. The project consists of two lots and includes the installation of paving elements on the trenches, the repair of curbstone edges, and the resurfacing of the paving next to the trenches. The procedure is public, allowing a wide range of contractors to participate. The works are technical in nature, requiring precise execution and coordination with existing infrastructure, and must comply with safety and environmental standards. The contracting authority expects a reliable partner with experience in road and infrastructure works, capable of delivering within the specified deadlines and meeting the requirements of an open tender.

Meer uit aanbestedingen halen?

Met TenderView.ai krijg je AI-analyse, gepersonaliseerde aanbevelingen en dagelijkse e-mail alerts.

Gratis starten