New to Dutch tenders?

Bidding from abroad

Read our step-by-step guide on registering with TenderNed and Mercell, ESPD requirements, language rules, and how the TenderView.ai AI assistant answers questions in your own language.

Read the guide

Public Tenders

Search 5,194 tenders from the Dutch government. Including AI summaries, deadlines and contact details.

Closedwerken

Stations - Arnhem - HWA repair

ProRail B.V.2 okt 2024

ProRail B.V. wishes to repair and partially renew the platform canopies of Arnhem Centraal Station. The project includes repairing and partially replacing the HWA rainwater drainage piping, repairing damage to the supporting structure caused by leaks, repairing sealant joints in the roofs of the platform canopies and the footbridge, and renewing the lighting in the platform canopies and above the stairs to the footbridge. Additionally, coordination of works on the platform for the BIPS project (fiber optics to information boards) must be provided. The contract is a non-public procedure for works, aimed at improving the safety, functionality, and aesthetics of the platform canopies and the associated infrastructure.

ClosedwerkenEU

Municipality of Zwolle - Realisation of superstructure footbridge

Gemeente Zwolle1 okt 2024

The Municipality of Zwolle intends to realise a sustainable pedestrian bridge (footbridge) over the railway lines of the station. The tender concerns the superstructure of the bridge, including civil engineering works, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of the installations for two years with optional extensions. Additionally, it includes the design of the public space at the northern entrance and the delivery of fired paving stones. The bridge is 10 m wide, consists of wood and sustainable materials, and contains greenery, benches, and art. The substructure will be realised in a separate phase. The municipality is fully financing the project and has a project website for more information. The procedure is non-public, and the CPV code is not specified.

ClosedwerkenEU

31070569: Announcement of a modification LVO Pilz and CCTV V2.0

Rijkswaterstaat is requesting an advisory report regarding life-extension maintenance of Pilz control installations and CCTV systems in the Volkerak and Haringvliet lock complex. The project focuses on the maintenance, inspection, and repair of the locks to ensure they comply with safety standards and functional requirements. Additionally, insight must be provided into the best solutions for LVO-CCTV and virtualization, including cost and action scenarios for 2027, 2032, and 2037. The assignment falls under a negotiated procedure without prior publication and concerns works in a risk area where continuous maintenance is crucial for the flood defenses.

Closedwerken

New Construction Municipal Yard Zeist - LOT 1: Building contractor II

Gemeente Zeist1 okt 2024

The Municipality of Zeist intends to realize a new Municipal Yard to replace the existing facility. The contract concerns a building contractor II and is subject to a negotiated procedure without prior publication. The works include an entrance zone, offices, canteen, changing area, a workshop with storage and welding room, general storage, an outbuilding for covered storage including a battery room, and an outbuilding for the storage of carcasses and fuels. The project constitutes one economic and technical whole, but is divided into three lots which are listed separately on TenderNed. The contractor must comply with all building, safety, and environmental legislation, including requirements for the safe storage of hazardous substances and ensuring an accessible, functional, and sustainable working environment.

Closedwerken

HDSR Market Information Day: clean and emission-free construction

Hoogheemraadschap De Stichtse Rijnlanden (HDSR) is organising a market information day for (SME) contractors performing works for the water board. The meeting focuses on the recent signing of the SEB Covenant (clean and emission-free construction) by the Unie van Waterschappen and its implications for HDSR's procurement and contract management. The focus lies on formulating requirements and award criteria regarding the use of equipment, monitoring and control during execution, and the challenges surrounding charging infrastructure. Additionally, developments in the fields of sustainable commissioning (DOS) and socially responsible commissioning and procurement (MVOI) will be discussed, providing contractors with insight into future expectations and compliance requirements.

Closedwerken

New Construction Municipal Yard Zeist - LOT 2: W&E Installation Technology

Gemeente Zeist1 okt 2024

The Municipality of Zeist intends to realize a new municipal yard to replace the existing yard. The contract concerns the design and execution of the installation technology (water, electricity, heating, and ventilation) for Lot 2, including an EOS (Electrical Transfer Facility) due to grid congestion. The yard consists of various facilities: entrance zone, offices, canteen, changing zone, workshop with welding area, general storage, an outbuilding for covered storage (incl. battery room), and an outbuilding for the storage of carcasses and fuels. The works are technically and economically integrated and fall under a negotiated procedure without publication. The tender requires an integrated approach to W and E installations, grid connection, and compliance with safety and environmental standards for a municipal yard.

ClosedwerkenEU

New construction Town Hall Municipality of Buren in Maurik

Gemeente Buren1 okt 2024€ 7.500.000

The tender concerns the new construction of a town hall for the Municipality of Buren in Maurik. The project is divided into two lots: lot 1 for building works and lot 2 for installation works. The contract is subject to a non-public procedure, meaning the procurement is limited to a select group of intended bidders. The works include the design, realization, and delivery of a fully functional town hall, including architecture, construction, installations (electrical, sanitary, HVAC), and adjustments to the surroundings. The contracting authority expects a project with high quality, sustainability, accessibility, and compliance with Dutch building and safety standards. The planning requires a clear timeline with milestones, while budget and cost control are central. The tender calls for an integrated approach, in which building and installation teams work closely together.

Closedwerken

31200147: Repair of Navigation Opening Weir Borgharen

This tender concerns the repair of the navigation opening at weir Borgharen, carried out by Rijkswaterstaat Programma's, Projecten en Onderhoud. The objective is to ensure the safety, stability, and functionality of the water infrastructure and to prevent future calamities. The assignment is a works contract awarded through negotiated procedure without publication. The repaired opening must be fully operational and reliable, with attention to structural integrity, watertightness, navigation, and environmental aspects. The contracting authority requires a detailed technical design, an executable plan, and a clear schedule. The contractor must possess experience with weir repairs, knowledge of hydraulic engineering standards, and the ability to operate within the specified safety and environmental regulations.

Closedwerken

Construction team friction space campus north

Wageningen University & Research1 okt 2024€ 4.050.000

Wageningen University & Research (WUR) is looking for a construction team to realize a temporary housing solution for the Plant Science Group. The tender concerns the construction of approximately 2,000 m² GFA, consisting of temporary units, to support the renovation of the Radix building. The contract is a construction team agreement: first a technical design (TO) within the specifications, followed by a price offer for the realization. The contracting authority has set a fixed tender price of € 4,050,000 (including € 50,000 for design and € 4,000,000 for construction). The procedure is public and the CPV code is not specified. The tender requires close cooperation between the contracting authority, architect, and contractor, with an emphasis on timely delivery, quality, and cost control.

Closedwerken

Market consultation redesign de Groote Vink

Gemeente Leiden30 sep 2024

The Municipality of Leiden is requesting advice via a market consultation regarding the implementation of a redesign of the area surrounding the former Intratuin on the Leidseweg. The objective is to relocate the garden center and create space for a residential construction project. In this process, a new access road must be constructed on Leiden territory, the Leidseweg must be restricted to local and bicycle traffic, and the accessibility of the Stevenshof district must remain guaranteed. The works also include the renovation of the Ter Wadding bridge, the relocation of existing cables and pipelines, and careful phasing of the execution. The market is asked for the most efficient and feasible implementation methods for these four critical elements.

Closedwerken

Zestraat Redesign

Gemeente Den Haag30 sep 2024€ 3.600.000

The Municipality of Den Haag intends to engage a contractor via a non-public procedure for the redesign of the Zeestraat and the Javastraat/Scheveningseweg intersection. The project focuses on creating a bicycle-friendly route with a 30 km/h zone, improving road safety, and supporting the ‘from palace to palace’ walking route. Works include temporary traffic measures, paving (7,800 m² paving elements, 5,300 m² asphalt), earthworks, sewerage, gullies, greenery, and street furniture. The works are located in the Centrum district and require a combination of construction, traffic, and water management.

Closedwerken

Dynamic Purchasing System (DPS) for planned underground fiber optic installation

Rijkswaterstaat Centrale Informatievoorziening is planning a Dynamic Purchasing System (DPS) for planned underground fiber optic installation projects, following the termination of the RODS Framework Agreement on July 1, 2025. The market consultation focuses on qualifying and admitting suppliers to the DPS, and testing individual projects in advance via a market consultation. The DPS offers flexibility to execute fiber optic installation quickly and efficiently, with a focus on quality, cost control, and timely delivery. The procurement is intended to involve a wide range of market participants, including small and medium-sized enterprises, and to ensure the continuity of the digital infrastructure. The procedure is a market consultation, allowing the government to explore the market and align the conditions with the needs of Rijkswaterstaat.

ClosedwerkenEU

WPB Wouw - New Construction and Renovation

Brabant Water NV29 sep 2024€ 35.000.000

Brabant Water NV intends to expand the water production capacity of the water production plant (WPB) Wouw from 4.0 to 7.5 million m³ per year. This will be achieved through the complete new construction of a main building that includes aeration, softening filtration, and pumps, among other things. The tender concerns a non-public procedure for a works contract, in which the contractor is responsible for the design, construction, installation, testing, and delivery of the new production building. The construction must comply with Dutch water quality standards, integrate seamlessly with the existing infrastructure, and ensure operational continuity. Additionally, there are requirements regarding environmental protection, safety, cost control, timely delivery, and aftercare. The contracting authority expects a technically advanced, sustainable, and cost-efficient solution that secures the future water demand in the distribution area of Wouw (West-Brabant).

ClosedwerkenEU

Dredging works through the use of a self-propelled grab crane vessel with hopper

Havenbedrijf Rotterdam NV (HbR) is looking for a self-propelled grab crane vessel with hopper for dredging works. The vessel must have its own propulsion, its own hopper, and a crane equipped with a sludge gripper (minimum capacity 2 m³). The hopper capacity must be at least 400 m³ and at most 1,550 m³. The procurement is conducted under an Innovation Partnership, through which HbR seeks a partner who not only provides the vessel but can also offer innovative solutions for dredging technology. The contracting authority expects an integrated approach in which the vessel, the hopper, and the sludge gripper work together seamlessly, with attention to efficiency, safety, and environmental friendliness. The tender focuses on a technically advanced, self-propelled solution suitable for the Rotterdam port environment.

ClosedwerkenEUMKB

AI 2024-0006 Landscaping 2025

The Municipality of Amsterdam has issued an open, public tender for a works contract (AI 2024-0006) focused on the major maintenance and renovation of grass and herbaceous areas within the municipal boundaries. The contract concerns the maintenance of existing vegetation and the execution of renovation works to ensure the quality and appearance of the public space. Works may be carried out on multiple lots, whereby a lot contractor may also perform works on another lot if the original contractor is unavailable. The contracting authority requires a reliable, experienced contractor with knowledge of garden and landscape management, capable of coordinating both maintenance and renovation on a large scale. The works fall entirely within the Municipality of Amsterdam, requiring strict adherence to local regulations and environmental standards.

ClosedwerkenEU

Electricity grid capacity expansion programme Rijnland Beneden Noord Holland (NuRijnland) and Veluwe-Gooi-Flevoland (NuMeren)

Alliander N.V.27 sep 2024

Alliander N.V. has an open tender for a large-scale electricity grid capacity expansion programme in the regions of Rijnland-Beneden Noord-Holland and Veluwe-Gooi-Flevoland. Due to economic growth, digitalisation, housing construction, and the shift from gas to electricity, the current grid is increasingly reaching capacity. Additionally, these regions offer favorable conditions for sustainable energy generation via solar and wind farms. The programme includes the installation of thousands of kilometres of cable and the construction of a large number of new stations to increase grid capacity, improve reliability, and facilitate the integration of renewable energy. The works must comply with Dutch safety and quality standards, take local regulations into account, and ensure the continuity of the grid. The project is a crucial step for the sustainability and economic development of the areas involved.

Closedwerken

Specification 2519, Maintenance Markings 2024 - 2028

Provincie Gelderland is seeking a contractor for the maintenance of road markings throughout the province. The contract runs from 1 May 2024 to 2 February 2026, with a possible extension until 31 January 2028. The work includes re-marking with cold plastic and sprayable marking material, applying new markings, cleaning, inspection, measurements, supply of materials, deployment of personnel and equipment, and the application of temporary traffic measures. The locations will be further determined by the management. The procedure is public and focused on works. The contracting authority expects a reliable partner with experience in road markings who is capable of working on various surfaces.

ClosedwerkenEU

31165985: For the Channel Wall Recovery Ossenisse II (HGOII)

This tender concerns the recovery of the channel wall in the Westerschelde, specifically in the Gat van Ossenisse II area. Following the widening in 2011, significant erosion has been observed, causing the channel walls to become unstable and increasing the risk of sliding. The works include stabilizing slopes with granular material, repairing the channel wall protection, and implementing measures to prevent further erosion. The project must comply with an ISO 9001-certified quality management system and is being carried out under an open procedure. The contracting authority is Rijkswaterstaat Programma's, Projecten en Onderhoud. The focus is on ensuring maritime safety and maintaining the distance to the primary flood defense.

ClosedwerkenEU

Redesign of Lombokplein (Construction Team)

Gemeente Utrecht25 sep 2024€ 33.460.000

The Municipality of Utrecht wishes to enter into a Construction Team agreement for the redesign of Lombokplein. The project concerns an extensive redesign of a central city square, including roadworks, paving, lighting, greenery, and public space. The agreement is intended to ensure an integrated approach, in which one construction team is responsible for design, execution, coordination, and aftercare. The procedure is non-public, allowing the municipality to approach a limited number of pre-selected parties. The agreement requires clear planning, quality and safety standards, and a focus on sustainability and inclusivity. The contracting authority expects transparent communication, regular progress reports, and a complete handover within the specified timeframe.

ClosedwerkenEU

Noardburgum new production plant construction

Vitens N.V.25 sep 2024€ 128.000.000

Vitens N.V. is launching a tender for the new construction of a production plant in Noardburgum. The objective is to realize a fully operational facility that provides the required capacity and quality of drinking water, with a completion date no later than 1 January 2030. The contract falls under the category of works and concerns a large-scale infrastructure project. The tender focuses on a package of construction and installation works, including design, construction, installation of water treatment equipment, and integration with existing networks. Suppliers must demonstrate that they are technically and financially capable of delivering within the specified timeframe and quality standards, and must comply with relevant laws and regulations regarding water quality, environment, and construction safety.

Meer uit aanbestedingen halen?

Met TenderView.ai krijg je AI-analyse, gepersonaliseerde aanbevelingen en dagelijkse e-mail alerts.

Gratis starten