31165985: For the Channel Wall Recovery Ossenisse II (HGOII)

Type
Works
45240000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This tender concerns the recovery of the channel wall in the Westerschelde, specifically in the Gat van Ossenisse II area. Following the widening in 2011, significant erosion has been observed, causing the channel walls to become unstable and increasing the risk of sliding. The works include stabilizing slopes with granular material, repairing the channel wall protection, and implementing measures to prevent further erosion. The project must comply with an ISO 9001-certified quality management system and is being carried out under an open procedure. The contracting authority is Rijkswaterstaat Programma's, Projecten en Onderhoud. The focus is on ensuring maritime safety and maintaining the distance to the primary flood defense.

Works · Open · European procedure

European
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
15:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderchannel wallerosiongranular material

01What is being requested

This tender concerns the recovery of the channel wall in the Westerschelde, specifically in the Gat van Ossenisse II area. Following the widening in 2011, significant erosion has been observed, causing the channel walls to become unstable and increasing the risk of sliding. The works include stabilizing slopes with granular material, repairing the channel wall protection, and implementing measures to prevent further erosion. The project must comply with an ISO 9001-certified quality management system and is being carried out under an open procedure. The contracting authority is Rijkswaterstaat Programma's, Projecten en Onderhoud. The focus is on ensuring maritime safety and maintaining the distance to the primary flood defense.

The navigation channel in the Westerschelde is protected by channel walls with stony material to support shipping and maintain the distance to the primary flood defense. Following the widening in 2011, erosion has been observed, causing the channel walls to become unstable and increasing the risk of sliding, particularly in the Gat van Ossenisse II area. The recovery works include stabilizing the slopes with granular material, repairing the channel wall protection, and measures to prevent further erosion. The project must be executed according to an ISO 9001-certified quality management system

45240000Works
131165985: For the Channel Wall Recovery Ossenisse II (HGOII)

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9669×
2BAM Infra B.V.SME9577×
3Heijmans Infra B.V.SME9565×
4Van Oord Nederland BVSME9519×
5KWS Infra B.V.SME9492×
6Dura Vermeer Infra Regionale Projecten BVSME9458×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the works for the Channel Wall Recovery Ossenisse II?
The works are aimed at recovering the channel wall protection in the Gat van Ossenisse II area. This includes stabilizing slopes with granular material and implementing measures to prevent further erosion, in support of shipping and maintaining the distance to the primary flood defense.
Which quality standard must the execution of the assignment comply with?
The project must be executed according to an ISO 9001-certified quality management system.
Why are the recovery works on the channel wall in the Westerschelde necessary?
Following the widening in 2011, erosion has been observed, causing the channel walls to become unstable and increasing the risk of sliding, specifically in the Gat van Ossenisse II area.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159