WPB Wouw - New Construction and Renovation
Brabant Water NV intends to expand the water production capacity of the water production plant (WPB) Wouw from 4.0 to 7.5 million m³ per year. This will be achieved through the complete new construction of a main building that includes aeration, softening filtration, and pumps, among other things. The tender concerns a non-public procedure for a works contract, in which the contractor is responsible for the design, construction, installation, testing, and delivery of the new production building. The construction must comply with Dutch water quality standards, integrate seamlessly with the existing infrastructure, and ensure operational continuity. Additionally, there are requirements regarding environmental protection, safety, cost control, timely delivery, and aftercare. The contracting authority expects a technically advanced, sustainable, and cost-efficient solution that secures the future water demand in the distribution area of Wouw (West-Brabant).
Works · Restricted · European procedure
01What is being requested
Brabant Water NV intends to expand the water production capacity of the water production plant (WPB) Wouw from 4.0 to 7.5 million m³ per year. This will be achieved through the complete new construction of a main building that includes aeration, softening filtration, and pumps, among other things. The tender concerns a non-public procedure for a works contract, in which the contractor is responsible for the design, construction, installation, testing, and delivery of the new production building. The construction must comply with Dutch water quality standards, integrate seamlessly with the existing infrastructure, and ensure operational continuity. Additionally, there are requirements regarding environmental protection, safety, cost control, timely delivery, and aftercare. The contracting authority expects a technically advanced, sustainable, and cost-efficient solution that secures the future water demand in the distribution area of Wouw (West-Brabant).
To meet future water demand in the distribution area of Wouw (West-Brabant), Brabant Water will expand the water production plant (WPB) Wouw. This additional production capacity will be realized through the complete new construction of a main building (aeration, softening filtration, and pumps). Production will increase from 4.0 to 7.5 million m³ of drinking water per year.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of the expansion of the water production plant Wouw?
What does the new construction of the main building at WPB Wouw include?
What are the most important technical aspects of the assignment?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159