Municipality of Zwolle - Realisation of superstructure footbridge
The Municipality of Zwolle intends to realise a sustainable pedestrian bridge (footbridge) over the railway lines of the station. The tender concerns the superstructure of the bridge, including civil engineering works, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of the installations for two years with optional extensions. Additionally, it includes the design of the public space at the northern entrance and the delivery of fired paving stones. The bridge is 10 m wide, consists of wood and sustainable materials, and contains greenery, benches, and art. The substructure will be realised in a separate phase. The municipality is fully financing the project and has a project website for more information. The procedure is non-public, and the CPV code is not specified.
Works · Restricted · European procedure
01What is being requested
The Municipality of Zwolle intends to realise a sustainable pedestrian bridge (footbridge) over the railway lines of the station. The tender concerns the superstructure of the bridge, including civil engineering works, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of the installations for two years with optional extensions. Additionally, it includes the design of the public space at the northern entrance and the delivery of fired paving stones. The bridge is 10 m wide, consists of wood and sustainable materials, and contains greenery, benches, and art. The substructure will be realised in a separate phase. The municipality is fully financing the project and has a project website for more information. The procedure is non-public, and the CPV code is not specified.
The footbridge in Zwolle will be a new walkway over the tracks connecting the north side and the south side of the station. The footbridge will be executed as a pedestrian connection. It will be an 'elevated street' where people can walk and linger. A bridge 10 meters wide over the tracks, with plenty of greenery, benches, and art, constructed from wood and sustainable materials. The footbridge will be realised in phases, consisting of a substructure and a superstructure. The current assignment relates to the realisation of the superstructure. The footbridge is being realised at the initiative
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the exact scope of the assignment for the superstructure of the footbridge?
What is the duration of the maintenance of the installations?
Which works at the south side do not fall within the fixed scope?
Which materials are used for the realisation of the footbridge?
Are the paving stones for the north square part of the delivery?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159