Municipality of Zwolle - Realisation of superstructure footbridge

Gemeente Zwolle · Restricted · 351337
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Zwolle intends to realise a sustainable pedestrian bridge (footbridge) over the railway lines of the station. The tender concerns the superstructure of the bridge, including civil engineering works, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of the installations for two years with optional extensions. Additionally, it includes the design of the public space at the northern entrance and the delivery of fired paving stones. The bridge is 10 m wide, consists of wood and sustainable materials, and contains greenery, benches, and art. The substructure will be realised in a separate phase. The municipality is fully financing the project and has a project website for more information. The procedure is non-public, and the CPV code is not specified.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPfootbridgepedestrian connectionroof gardens

01What is being requested

The Municipality of Zwolle intends to realise a sustainable pedestrian bridge (footbridge) over the railway lines of the station. The tender concerns the superstructure of the bridge, including civil engineering works, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of the installations for two years with optional extensions. Additionally, it includes the design of the public space at the northern entrance and the delivery of fired paving stones. The bridge is 10 m wide, consists of wood and sustainable materials, and contains greenery, benches, and art. The substructure will be realised in a separate phase. The municipality is fully financing the project and has a project website for more information. The procedure is non-public, and the CPV code is not specified.

The footbridge in Zwolle will be a new walkway over the tracks connecting the north side and the south side of the station. The footbridge will be executed as a pedestrian connection. It will be an 'elevated street' where people can walk and linger. A bridge 10 meters wide over the tracks, with plenty of greenery, benches, and art, constructed from wood and sustainable materials. The footbridge will be realised in phases, consisting of a substructure and a superstructure. The current assignment relates to the realisation of the superstructure. The footbridge is being realised at the initiative

45000000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME10058×
2Van Gelder BVSME10053×
3KWS Infra B.V.SME9692×
4SPIE Nederland B.V.SME9623×
5BAM Infra B.V.SME9577×
6Combinatie Heijmans - SWARCOUnknown9373×

05Legal themes that may be relevant here

06Frequently asked questions

What is the exact scope of the assignment for the superstructure of the footbridge?
The assignment includes the civil engineering works, the construction of roof gardens (excluding planting), the delivery and installation of water systems for play water and irrigation, the design of the public space at the northern entrance, and the delivery of fired paving stones.
What is the duration of the maintenance of the installations?
The maintenance of the installations has a duration of two years, with the possibility of two options to extend each by one year.
Which works at the south side do not fall within the fixed scope?
The design of the public space at the south side entrance is not within the scope of this contract, but is included as an option or provisional sum in the specifications.
Which materials are used for the realisation of the footbridge?
The footbridge is 10 meters wide and is constructed from wood and other sustainable materials, including facilities such as greenery, benches, and art.
Are the paving stones for the north square part of the delivery?
No, the delivery of fired paving stones is part of the assignment, with the exception of the stones already purchased by the Municipality of Zwolle for the north square.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159