ClosedWorksEuropeanOpen

Electricity grid capacity expansion programme Rijnland Beneden Noord Holland (NuRijnland) and Veluwe-Gooi-Flevoland (NuMeren)

Alliander N.V. · Open · 1 lots · 350946
Type
Works
45314300
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Alliander N.V. has an open tender for a large-scale electricity grid capacity expansion programme in the regions of Rijnland-Beneden Noord-Holland and Veluwe-Gooi-Flevoland. Due to economic growth, digitalisation, housing construction, and the shift from gas to electricity, the current grid is increasingly reaching capacity. Additionally, these regions offer favorable conditions for sustainable energy generation via solar and wind farms. The programme includes the installation of thousands of kilometres of cable and the construction of a large number of new stations to increase grid capacity, improve reliability, and facilitate the integration of renewable energy. The works must comply with Dutch safety and quality standards, take local regulations into account, and ensure the continuity of the grid. The project is a crucial step for the sustainability and economic development of the areas involved.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderelectricity gridcapacity expansioncable

01What is being requested

Alliander N.V. has an open tender for a large-scale electricity grid capacity expansion programme in the regions of Rijnland-Beneden Noord-Holland and Veluwe-Gooi-Flevoland. Due to economic growth, digitalisation, housing construction, and the shift from gas to electricity, the current grid is increasingly reaching capacity. Additionally, these regions offer favorable conditions for sustainable energy generation via solar and wind farms. The programme includes the installation of thousands of kilometres of cable and the construction of a large number of new stations to increase grid capacity, improve reliability, and facilitate the integration of renewable energy. The works must comply with Dutch safety and quality standards, take local regulations into account, and ensure the continuity of the grid. The project is a crucial step for the sustainability and economic development of the areas involved.

The electricity grid is reaching capacity in more and more places in the regions of Rijnland-Beneden Noord-Holland and Veluwe-Gooi-Flevoland. This is due to, among other things, the growing economy, the digitalisation of society, the record-speed construction of houses, and the transition of many businesses and consumers from natural gas to electricity. Furthermore, these regions are attractive for the generation of sustainable energy via solar and wind farms. To accommodate this, the electricity grid must be expanded. However, this is not happening as quickly as the current pace of developmen

45314300Works
1Electricity grid capacity expansion programme Rijnland Beneden Noord Holland (NuRijnland) and Veluwe-Gooi-Flevoland (NuMeren)€2,100,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Arcadis Nederland B.V.SME93116×
2Combinatie Heijmans - SWARCOUnknown9374×
3Haskoning Nederland B.V.SME92100×
4Sweco Nederland B.V. SME9171×
5BAM Infra B.V.SME9077×
6Witteveen+Bos Raadgevende ingenieurs B.V.SME9063×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the NuRijnland and NuMeren programme?
The programme aims to expand the capacity of the electricity grid in the regions of Rijnland-Beneden Noord-Holland and Veluwe-Gooi-Flevoland to accommodate the increasing demand caused by economic growth, digitalisation, housing construction, and the transition from gas to electricity.
Which works are part of this capacity expansion programme?
The works include the installation of thousands of kilometres of cable and the placement of a large number of new stations to increase grid capacity and facilitate the integration of renewable energy via solar and wind farms.
Why is the expansion of the electricity grid in these regions necessary?
The electricity grid is reaching capacity in more and more places due to the growing economy, digitalisation, the rapid construction of homes, and the shift of businesses and consumers from natural gas to electricity, as well as the favourable conditions for sustainable energy generation.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159