31152620: Project GROCO 5
This project focuses on the corrosion prevention of the most essential components of the Maeslantkering and Hartelkering, so that structural integrity and long-term safety are maintained.
New to Dutch tenders?
Read our step-by-step guide on registering with TenderNed and Mercell, ESPD requirements, language rules, and how the TenderView.ai AI assistant answers questions in your own language.
Read the guideSearch 8,926 tenders from the Dutch government. Including AI summaries, deadlines and contact details.
This project focuses on the corrosion prevention of the most essential components of the Maeslantkering and Hartelkering, so that structural integrity and long-term safety are maintained.
Short summary of the procurement data.
The Municipality of Westerkwartier has issued a contract via a National public tender (ARW 2016, Chapter 2) for the reconstruction of the Jonkersvaart road in Leek. The tender has since closed, with no value stated, and had a deadline of 16 September 2024 (10:00 UTC).
Reconstruction Nieuwdorperweg – major asphalt maintenance and traffic engineering adjustment of bicycle crossing.
This is a closed tender for the replacement of a drinking water distribution pipeline of approximately 3.7 km in Oostzaan, carried out by PWN Waterleidingbedrijf Noord-Holland.
The procurement by the Municipality of Amsterdam (TenderNed 346112) concerns the construction of a new sports hall on Meidoornweg. The project is intended to provide two new schools with sports facilities and is also socially accessible during leisure time.
This tender is a non-public EU procurement for the realisation of angio rooms, a central scoping service, and a technical layer at the Universitair Medisch Centrum Utrecht. No deadline date or value is known. No additional documents, criteria, parks, changes, contact details, or procurement results are provided.
This is an open tender for the deployment of temporary sports facilities. The Municipality of Amsterdam is looking for a turnkey project where usability, sustainability, and safety are central.
The procurement 'Settlement Flow ZV3T' by Waterschap Hollandse Delta is a cancelled public works contract aimed at strengthening primary flood defenses at four locations. No deadline or value has been specified; the procedure was public and digital. All other field information is missing and has therefore been left blank.
This tender proposal concerns the construction of a noise barrier for the A15 in the Oosterpark to reduce noise nuisance for residents of the Ridderkerk district. The contract is issued via a construction team agreement, followed by a RAW specification under the UAV 2012 regime.
Construction Team Vogelbuurt West e.o. in Zwijndrecht – a public works procurement with a 2-phase approach, focused on livability, biodiversity, and climate adaptation.
This market consultation is an initial step in preparing for a future EU procurement for the new construction of Qutech. TU Delft is gathering market information to provide direction for a possible further market consultation and the final procurement procedure.
Relining sewerage for four municipalities via a framework agreement with one contractor.
Rijksvastgoedbedrijf has opened a closed tender for the construction of a new Technology Center Land (TCL) in Leusden, aimed at the Technical Department of Defence. The tender is a competitive dialogue within the work test plan, with digital availability at the European level.
This procurement framework describes an open procedure (works) for the renovation of the Sluisjesdijk (SLDK) sludge processing plant within the framework of Project Sluisjesdijk 2.0. The assignment focuses on an integrated, step-by-step renewal of the technical installations that are nearing the end of their service life, while maintaining the continuity of sludge processing during the works. The approach is based on a construction team model, involving a collaborative verification and design agency, with the possibility to outsource sub-processes to specialized contractors. The total value of the assignment is currently unknown, and the deadline has not been specified.
Construction team contractor sought for the reconstruction of the Westfries Museum. The publication is closed and the project had a previous, aborted phase. A new, adjusted sketch requires expertise within the prescribed frameworks.
The tender concerns the development of a maximum of 25 lifetime-friendly apartments in the Loverbosch III district of Asten, of which at least 75% must fall within the affordable segment (max. purchase price €355,000.00). The assignment is a single coherent project, without lots or division, and commences on 1 July 2024.
Schiphol Nederland BV has announced a construction team and UAV agreement via voluntary transparency for the 150/20kV substation Schiphol Zuidoost. Since no bids were received during the regular EU procurement, Schiphol initiated a direct negotiation procedure with K_Dekker (construction) and Equans (installation). Commissioning is planned for December 2026. Both the construction and installation contracts amount to approximately €20 million for construction and €10 million for installation, excluding VAT. The tender is still open, the deadline has not been specified, and the total (unknown) value is yet to be determined.
Work for specialist maintenance and renovation of grass sports fields in Amsterdam.
Construction team agreement for the de Scheg pressure main – Municipality of Amstelveen (closed), works, open procedure; CPV 45232440; digitally available, non-European; no value specified.
Met TenderView.ai krijg je AI-analyse, gepersonaliseerde aanbevelingen en dagelijkse e-mail alerts.
Gratis starten