AwardedWorksOpen

Reconstruction of Jonkersvaart road in Leek

Gemeente Westerkwartier · Open · 1 lots · 346169
Type
Works
45233140
Estimated value
€ 1,30M
estimated
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

Major maintenance to the Jonkersvaart consisting of various works on paving, sewerage, and groundskeeping with completion in December 2024.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€1,300,000
estimated value
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The work concerns the major maintenance of the Jonkersvaart in Jonkersvaart over a length of approx. 4,140 meters. The works include, among other things, the breaking up and application of paving, sewerage, earthworks, and groundskeeping.

The Municipality of Westerkwartier intends to award a contract for the Reconstruction of Jonkersvaart road. For the procurement of this contract, the municipality has chosen a National public tender based on the ARW 2016, Chapter 2.

45233140€ 1,30MWorks
1Reconstruction of Jonkersvaart road

02Strategic insight

Strategic insight · AI analysis
Ensure a detailed traffic plan to guarantee accessibility within the village center. Coordinate the supply routes closely with management to minimize nuisance. Take into account the strict stoppunten and inspection points for the quality assurance of the road paving.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
Accessibility to homes and accessibility for emergency services must be guaranteed at all times.Important
The layout plan of the depot must be submitted at least 10 days before the start of the works.Important
For the application of temporary traffic measures, permission is required from the road manager via Melvin.Important
Failure to comply with stoppunten during quality assurance may lead to a fine of € 500.00 per occurrence.Important
The contractor must provide a substantiated bid status after the award.Important

04Can I take part?

Technical — Possess a quality system relating to the nature of the work in accordance with article 01.13.01 of the Standard.
Technical — Be in possession of a VCA certificate or an equivalent safety assurance system.

05Value in context

€1,300,000

06Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9870×
2Heijmans Infra B.V.SME9865×
3De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9826×
4KWS Infra B.V.SME9792×
5BAM Infra B.V.SME9777×
6Combinatie Heijmans - SWARCOUnknown9773×

07Tender documents

TN481329 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20241030095425pdfOct 30, 2024 · 9 KB
Nota van inlichtingen 2024-09-11-1pdfSep 11, 2024 · 2 KB
Nota van inlichtingen 2024-09-11-2pdfSep 11, 2024 · 2 KB
Nota van inlichtingen bestek WK 2024-03pdfSep 6, 2024 · 263 KB
Nota van inlichtingen bestek WK 2024-03nsxSep 6, 2024 · 54 KB
Bestek incl nota WK 2024-03 Groot onderhoud JonkersvaartrsxSep 6, 2024 · 853 KB
Nota van Inlichtingen_20240906pdfSep 6, 2024 · 105 KB
Bestek incl nota WK 2024-03 Groot onderhoud JonkersvaartpdfSep 6, 2024 · 981 KB
Inschrijvingsstaat nav nota WK 2024-03pdfSep 6, 2024 · 116 KB
Bijlage 10_UEApdfAug 19, 2024 · 2097 KB
OneDrive_1_16-8-2024zipAug 19, 2024 · 55826 KB
Invulformulieren in Word, versie 20240819docxAug 19, 2024 · 38 KB

08Legal themes that may be relevant here

09Frequently asked questions

Which works are carried out under the major maintenance?
The works include, among other things, the removal of bitumen paving, the breaking up of concrete paving stones, concrete tiles, kerbs, and guide strips, as well as earthworks and sewerage works.
Which plans must be drawn up for the execution?
Various plans must be drawn up, including a traffic measures plan, a quality plan, a plan for handling released materials, and an inspection plan.
Which specific works are part of the removal of the paving?
The works include cleaning the paving, removing markings and detection loops, sawing and milling tar-free asphalt, and breaking up concrete paving.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,3 mln

Gegunde waarden in CPV 45 · werken n=3159