ClosedWorksEuropeanCompetitive dialogue

22620 - Realization of New Construction Technology Center Land at Leusden

Rijksvastgoedbedrijf · Competitive dialogue · 1 lots · 345918
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

This is a European competitive dialogue for the realization of a new Technology Center Land at Leusden of approximately 60,000 m² gfa. The assignment includes various construction disciplines and requires specific expertise in industrial workshops and the coordination of specialized installations.

Works · Competitive dialogue · European procedure

EuropeanComplete timeline
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
Estimate not published
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Realization of the new construction of the Technology Center Land at Leusden, consisting of site preparation, building, electrical, mechanical, and transport installations for approximately 60,000 m² gfa.

Since 1956, the Technical Department has been housed in its current workshop in Leusden. Initially, this was only for the overhaul of the tank of that time, the Centurion. Today, the Technical Department performs Depot Level Maintenance (DLM) on all land-based weapon systems of Defence. In addition to the periodic and major maintenance of these land-based systems, the department also carries out modifications, testing, and projects to improve the deployment of the Landmacht. Because of budget cuts within Defence, major investments to maintain the complex in Leusden have been lacking in recent

45000000Works
1Realization of New Construction

02Strategic insight

Strategic insight · AI analysis
Ensure a strong substantiation of the technical experience with industrial workshops and multifunctional accommodations. Note that the reference assignments must exactly meet the specified scale and usage functions to prevent exclusion. Prepare the application in a timely manner via TenderNed to avoid technical malfunctions.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The contractor has a coordination obligation for the work of third parties regarding the nine specific user installations.Important
A revision clause is possible for additional works up to 10% of the tender sum for specialties.Important
A revision clause is possible for sustainability requirements up to 7% of the tender sum.Important
Reference assignments must not have been completed more than twelve years ago.Important
Project sheets or self-prepared documents are not accepted as evidence of technical competence.Important

04Can I take part?

Professional capability · 3
Possession of a safety management system: VCA certificate for the coordinating main contractor or equivalent, and VCA certificate for combiners or third parties or equivalent.Professional capability
Possession of a certified quality management system based on NEN-EN-ISO:9001:2015.Professional capability
Possession of a certified environmental management system based on NEN-EN-ISO:14001:2015.Professional capability
Technical · 5
G1 Realization Building: Workshop with industrial function, minimum size 5,000 m² gfa (of which 1,500 m² is new construction), utility building, completed within 12 years.Technical
G2 Realization Electrical: Workshop with industrial function, minimum size 5,000 m² gfa (of which 1,500 m² is new construction), utility building, completed within 12 years.Technical
G3 Realization Mechanical: Workshop with industrial function, minimum size 5,000 m² gfa (of which 1,500 m² is new construction), utility building, completed within 12 years.Technical
G4 Realization Building: Coordination in main contract of electrical and mechanical realization works, minimum size 5,000 m² gfa (of which 1,500 m² is new construction), utility building, completed within 12 years.Technical
G5 Realization Building: Multifunctional accommodation with multiple users and at least two different usage functions, minimum size 5,000 m² gfa (of which 1,500 m² is new construction), utility building, completed within 12 years.Technical

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Process & timeline

publication of announcement on TenderNed
03-12-2024
deadline for submission of questions
12-02-2025 11:00 uur
provision of final memorandum of clarification
18-02-2025
deadline for submission of applications
[telefoonnummer verwijderd]:00 uur
provisional selection decision
17-03-2025
stand-still period
18-03-2025 tot 25-03-2025
final selection decision
26-03-2025
invitation to dialogue
27-03-2025
propose first dialogue session
16-04-2025
first dialogue session
24-04-2025
propose second dialogue session
28-05-2025
second dialogue session
04-06-2025
uiterlijke indiening vragen
11-06-2025 11:00 uur
verstrekking laatste nota van inlichtingen
19-06-2025
uiterlijke indiening inschrijvingen
17-07-2025 11:00 uur
voorlopige gunningsbeslissing
14-08-2025
Alcatel-termijn
15-08-2025 tot 03-09-2025
definitieve gunningsbeslissing
04-09-2025

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1Heijmans Utiliteit B.V.SME10027×
2BINX Smartility B.V.SME9227×
3BAM Bouw en Techniek bvSME9134×
4Hegeman Bouw & Infra B.V.SME9031×
5Combinatie Heijmans - SWARCOUnknown9073×
6BAM Infra B.V.SME9077×

09Tender documents

TN481344 - EF38 Aankondiging van wijziging van een opdracht - algemene richtlijn 20260126120255pdfJan 27, 2026 · 142 KB
TN481344 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250929100345pdfSep 30, 2025 · 10 KB
22620 - TCL nvi 04 aanmeldingsfase_01_defpdfFeb 26, 2025 · 193 KB
Planning_02pdfJan 30, 2025 · 106 KB
22620 - TCL Aanbestedingsleidraad aanmeldingsfase ECD_06_defpdfJan 30, 2025 · 454 KB
22620 - TCL Aanbestedingsleidraad dialoog en inschrijvingsfase ECD_06_defpdfJan 30, 2025 · 308 KB
TN481344 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250130140330pdfJan 30, 2025 · 10 KB
22620 - TCL nvi 03 aanmeldingsfase_03_defpdfJan 30, 2025 · 190 KB
22620 - TCL nvi 02 aanmeldingsfase_02_defpdfJan 30, 2025 · 183 KB
22620 - TCL nvi 01 aanmeldingsfase_01_defpdfDec 18, 2024 · 177 KB
BIJLAGE - InschrijvingsbiljetpdfDec 4, 2024 · 205 KB
Model Toezicht Keuringsplan_01pdfDec 4, 2024 · 277 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the purpose of the new construction of the Technology Center Land (TCL)?
The new TCL serves as a modern facility for high-tech, reliable, and innovative maintenance, modifications, and testing of the land-based equipment of Defence. It replaces the outdated housing of the Technical Department in Leusden.
What main buildings does the Technology Center Land project consist of?
The project consists of three large buildings: the main building, building DRS2 (Drying, Cleaning, Blasting, and Spraying) and the Advanced Technology Center (ATC). Additionally, there are outbuildings such as the Plaat and the Facility building.
Which system was applied in the specification for the new construction?
The specification was drawn up using the STABU system, STABU2 online Catalogue edition, and contains texts from the RRU 2012 edition 2024-1 under license number 88.02.01.E. Additionally, the KOMO specification catalogue was used.
Which testing methods are used for quality assurance?
Within the quality assurance process, FAT tests (Factory Acceptance Test) and (i)SAT tests ((i)Site Acceptance Test) are used as part of the requirements for the installations and the delivery.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159