New to Dutch tenders?

Bidding from abroad

Read our step-by-step guide on registering with TenderNed and Mercell, ESPD requirements, language rules, and how the TenderView.ai AI assistant answers questions in your own language.

Read the guide

Public Tenders

Search 5,194 tenders from the Dutch government. Including AI summaries, deadlines and contact details.

ClosedwerkenEU

Substation works

Alliander N.V.4 okt 2024€ 422.700.000

Liander, as the grid operator, must modernize a large number of Medium Voltage Rooms (MSRs) to meet current requirements regarding asbestos, electrical safety, and operational management. The assignment includes replacing or refurbishing transformers, MV switchgear, and associated installation components, and where necessary, adjusting the low-voltage installation. The goal is a safe, future-proof substation that complies with current policy. The procurement is a competitive procedure with negotiation, aimed at delivering a (touch) safe substation. The works require a combination of electrical, building, and safety expertise, with attention to asbestos removal and minimizing downtime. The contracting authority expects full project planning, quality assurance, and compliance with regulations.

ClosedwerkenEU

Announcement of voluntary transparency - Installation technology to make fire station Belcampostraat 10 energy neutral

The Municipality of Utrecht announces voluntary transparency regarding making the fire station at Belcampostraat 10 energy neutral. The project focuses on installing a seasonal underground thermal energy storage, specifically of the HoCoSto system. The contract falls under the category of works and is executed via a negotiated procedure without publication, meaning the tender is not made public. The focus lies on realizing an energy-efficient, sustainable fire station that complies with current regulations and CO2 reduction objectives. The contracting authority expects a technical design, construction, installation, and delivery of the thermal energy storage system, including integration with existing infrastructure and ensuring the operational continuity of the fire department.

ClosedwerkenEU

1-W-32317-23: redevelopment Hofplein Rotterdam (NL)

Gemeente Rotterdam4 okt 2024€ 21.000.000

The Municipality of Rotterdam intends to redesign the Hofplein in the Stadsdriehoek district into a multifunctional, green, and sustainable urban space. The project includes railway, paving, sewerage, and additional works, aimed at improving flow, livability, greening, climate adaptation, and economic development. The execution is divided into three integral parts: collaborative work preparation, realization, and maintenance, with the possibility of overlapping phases. The assignment requires a holistic approach that combines technology, mobility, management, local employment, and climate adaptation, in line with the Openbare Ruimte 2019-2029 vision and the Rotterdamse Mobiliteits-aanpak. The contracting authority expects a partner capable of contributing to a place that invites meeting and staying, with a strong Rotterdam identity.

ClosedwerkenEU

Substation works

Alliander N.V.4 okt 2024€ 422.700.000

Alliander N.V. is seeking a contractor for the modernization of Medium Voltage Rooms (MSR) and the low voltage installation at various substations. The works include asbestos removal, improving electrical safety, replacing transformers and MV switchgear, and adjusting operations to comply with current safety and environmental standards. The objective is a (touch) safe, future-proof substation that complies with current policy. The assignment is non-public and requires specialist knowledge of electrotechnical installations, asbestos removal, and construction safety.

Closedwerken

Replacing BMS and Retrofitting AHU's Rotterdam Ahoy

Gemeente Rotterdam4 okt 2024€ 2.400.000

The Municipality of Rotterdam has an open tender for the replacement of the central building management system (BMS) and the retrofitting of the AHU, FCU, and ACU systems in Rotterdam Ahoy. The project includes the migration of the current Priva Compri HX installation to Priva Blue ID in the Arena, Hall 1, Plaza, and Offices sections, expanding the control cabinet technology for the new controls and power supplies, and revising the AHU, FCU, and ACU systems in all relevant sections. The exact technical specifications are laid down in the attached STABU specification book. The assignment focuses on installation works and requires a high level of technical expertise in HVAC and control systems.

Closedwerken

Site preparation Europakwartier Noord, Stadsbos phase 1, Municipality of Almere

Gemeente Almere4 okt 2024

The Municipality of Almere is issuing an open tender for the site preparation of the Europakwartier Noord, Stadsbos phase 1, in area 4C2 Almere Poort. The project concerns the development of a new, green and recreational area including a walking and cycling path, a play zone, a recreation park, and a water feature. The contracting authority expects a fully developed design, an execution plan, a construction drawing, and a cost estimate. The works include, among other things, the removal of existing buildings, the installation of foundations, the placement of infrastructure, the planting of vegetation, and the realization of play and recreational facilities. The procurement is an open procedure, in which the contracting authority applies price, quality, and sustainability as the primary selection criteria. The expected completion is in 2025, with a duration of 12 to 18 months. The contracting authority expects a project team with experience in green space development, site preparation, and landscape architecture, and good cooperation with the municipality and other stakeholders.

Closedwerken

Sustainable real estate Hogeschool Utrecht

Hogeschool Utrecht is conducting a market consultation to prepare for the sustainability of its real estate portfolio. The assignment concerns analyzing the current state of the buildings, identifying opportunities for energy savings and CO₂ reduction, and drafting a roadmap for future procurements. The consultation focuses on works, with the aim of producing a feasibility study and a strategic plan for sustainable renovations and new construction. The contracting authority expects a structured analysis, recommendations for priority interventions, and an indication of the required investments. The results shall serve as a basis for potential future procurements.

ClosedwerkenEU

Maintenance and service agreement for the Liebherr combined heat and power installation RWZI Tiel

The tender concerns a maintenance and service agreement for the Liebherr combined heat and power (CHP) installation at the RWZI (wastewater treatment plant) in Tiel, carried out by Waterschap Rivierenland. The contract focuses on ensuring the continuity of energy and heat transport, including preventive and corrective maintenance, availability of spare parts, and compliance with safety and environmental standards. The procurement is conducted under a negotiated procedure without publication, requiring the selection of a specialized service provider with experience in Liebherr installations and wastewater treatment processes. The agreement includes technical support, periodic inspections, and the provision of reports on performance and maintenance history. The contracting authority expects a clear Service Level Agreement (SLA) with fixed response times and structured incident management. The tender is aimed at a long-term partnership with a focus on reliability, energy efficiency, and sustainability.

Closedwerken

Advance notice market consultation Nieuwe Rijnhaven block 1

The Municipality of Rotterdam announces a market consultation for Block 1 of the Nieuwe Rijnhaven, a high-density mixed-use project in the Rijnhaven. The program comprises 80,000–120,000 m² gross floor area, of which 25% is non-residential and 75% is residential, with a maximum of 1,030 dwellings. The market consultation is intended to leverage private expertise and knowledge for a careful procurement process. The municipality plans a series of steps: publication, information meeting, written questions, bilateral discussions, and a final report. The target group consists of developers, builders, and real estate investors with experience in high-density mixed-use projects. The consultation runs from 11 October to 20 December, with an important deadline for written questions on 11 November. The focus lies on testing plans, identifying risks, and optimizing the procurement strategy.

Closedwerken

Maintenance works Soemeersingel Helenaveen Municipality of Deurne

Gemeente Deurne3 okt 2024€ 1.721.200

The Municipality of Deurne has an open tender for maintenance works on the Soemeersingel. The project includes the removal of 24 local subsidences and road narrowings caused by settlements due to peat shrinkage. The current paving construction will be completely replaced. The works consist of breaking up, excavating sand culvert and peat layer, storing peat, filling the culvert with sand, reinstating the foundation layer, applying asphalt paving, installing a concrete curb as edge restraint, temporary facilities, and general works. The assignment requires accurate geotechnical analysis, good coordination with the municipality, and ensuring minimal traffic disruption. The execution must comply with Dutch standards for road maintenance and environmental protection.

Closedwerken

Preparing Winkelsteeg for construction

The Municipality of Nijmegen is conducting a national public procurement for the preparation of a shopping alley for construction. The project includes, among other things, clearing, dismantling of existing structures, earthworks and foundation works, installation of foundations, construction of roads and infrastructure, and the realization of a safe and accessible environment for future construction projects. The contracting authority emphasizes quality, safety, environmental friendliness, and minimizing nuisance for local residents. The tender is open, allowing all interested companies to participate. The expected completion period is within 12 months after contract signing, with a clear schedule and milestones.

Closedwerken

Making fire station Belcampostraat 10 energy neutral through installation technology

The Municipality of Utrecht is requesting a vision via a market consultation regarding making the fire station at Belcampostraat 10 energy neutral. The project focuses on seasonal underground thermal energy storage, in which a main contractor works together with a prescribed subcontractor. The consultation covers, among other things, the deviating construction, the energy management process after completion, the possibilities to demonstrate energy neutrality, and the general vision on the specifications and the framework conditions. The contracting authority seeks insight into feasibility, technical solutions, costs, risks, and the necessary cooperation between parties. The emphasis lies on sustainable, cost-efficient solutions that meet the requirements of the municipality and the fire department, with a clear focus on monitoring, performance tracking, and certification of energy neutrality.

ClosedwerkenEU

31193561: Security Oosterscheldekering

Rijkswaterstaat is conducting a competitive dialogue to improve the security of the Oosterscheldekering (OSK). The project focuses on building, installation technology, and organizational measures resulting from the IMPAKT plan and the NCTV security policy. The works include, among other things, structural modifications to the Ir. J.W. Topshuis, reinforcing measures for the OSK and the brouwersspuisluis, the installation of surveillance and security systems, the establishment of an RWS communication network, and the installation of barrier gates for access control systems. Following realization, a multi-year maintenance contract of 15 years (with an optional Midlife Update) must be concluded to ensure sustainability and compliance with the applicable frameworks. The assignment requires a combination of civil engineering, security technology, and project management, with an emphasis on the integration of existing infrastructure and future expandability.

ClosedwerkenEU

Development and realization of Hollewand Midden and Noord

Gemeente Hattem2 okt 2024

The Municipality of Hattem intends to develop a residential care zone, named Geldersedijk, on the site of the former ice rink. Within this zone, two residential buildings, Hollewand Midden and Hollewand Noord, are to be realized. Each building contains approximately 24 mid-market rental homes and 18 high-end owner-occupied apartments, with shared built parking facilities. The procurement is a non-public procedure in which a market party must develop and execute a complete plan at its own risk, within the frameworks set by the municipality. The assignment requires an integrated approach to architecture, construction, project management, and financing, whereby the party must handle the full construction and delivery. The municipality expects a sustainable, functional, and financially viable solution that aligns with the needs of future residents and the local infrastructure.

ClosedwerkenEU

31070569: Announcement of a change in cost compensation for replacing hydraulic systems HV1

This tender concerns a change in the cost compensation for replacing hydraulic systems in the Haringvliet locks, part of the multi-year maintenance programme of Rijkswaterstaat. The locks are crucial for flood defenses and protection against flooding. The contract focuses on the careful maintenance, inspection, and repair of the locks to ensure they meet safety standards. SPIE has already begun preparations for hydraulic works at the Goereese lock and has approached Vialis for consultation, estimated amounts, and documentation. The procedure is a negotiated procedure without publication, aimed at a rapid and efficient execution of the works.

ClosedwerkenEU

EU procurement Chain collaboration sustainability 5,700 existing homes

Stichting Thius2 okt 2024

Stichting Thius, a housing association, has selected three parties via a voluntary EU procurement procedure using competitive dialogue to improve the sustainability of approximately 5,700 existing homes. The project is a programmatic, cross-project approach centered around a chain collaboration agreement. The focus is on multi-year cooperation with market parties to realize an integrated, sustainable retrofit. The assignment falls under the category of works and requires an innovative, scalable approach encompassing both technical and organizational aspects of housing sustainability. The procedure is intended to find the best solutions for a large-scale sustainability project within EU rules.

ClosedwerkenEU

31070569: Announcement of a change Relocation of JS control desk

Rijkswaterstaat announces a change in the multi-year maintenance of the Volkeraksluizencomplex and the Haringvlietsluizen. From mid-2023, the operation of the Haringvlietbrug will take place remotely from a new Control Building of the Volkeraksluizencomplex, which will receive a fifth control position. The operation of the Jachtensluis will also be integrated here, meaning it will no longer be operated locally during the summer period. The local-central operation of the Jachtensluis will move to the new control position, while the current local operation and the buikorgel remain in the local control hut of hoofd M. The goal is to ensure the safety and functionality of the locks, reduce local interventions, and optimize operational efficiency.

Closedwerken

Stations - Arnhem - HWA repair

ProRail B.V.2 okt 2024

ProRail B.V. wishes to repair and partially renew the platform canopies of Arnhem Centraal Station. The project includes repairing and partially replacing the HWA rainwater drainage piping, repairing damage to the supporting structure caused by leaks, repairing sealant joints in the roofs of the platform canopies and the footbridge, and renewing the lighting in the platform canopies and above the stairs to the footbridge. Additionally, coordination of works on the platform for the BIPS project (fiber optics to information boards) must be provided. The contract is a non-public procedure for works, aimed at improving the safety, functionality, and aesthetics of the platform canopies and the associated infrastructure.

Closedwerken

Redesign Ooievaarsbuurt

The Municipality of Wijdemeren has an open tender for the redesign of the Ooievaarsbuurt in Ankeveen. The project concerns a complete redesign of the residential area, including the redesign of the street infrastructure, construction of new pedestrian and cycle paths, renewal of street lighting, greenery, and the installation of new signage. The assignment focuses on improving the livability, accessibility, and safety of the area, with attention to sustainable and energy-efficient solutions. The tender is an open procedure without a CPV code, allowing a wide range of contractors to participate. The municipality expects completion within 12 to 18 months, with a clear focus on quality, cost control, and minimal disruption to residents.

Closedwerken

Area North - Realization BBV North FH+FW 2025 D-003257

ProRail B.V.2 okt 2024

This non-public tender from ProRail B.V. concerns the renovation of superstructure constructions at various railway locations in the northern part of the Netherlands for the 2025 plan year. The project falls under the European ProRail Recognition Scheme (EP2019) and is carried out via a negotiated procedure based on ARN2016 Part II. The works include function maintenance and function change of existing superstructure systems on the Leeuwarden–Harlingen, Leeuwarden–Groningen, Leeuwarden–Meppel, Emplacement Meppel, and Emplacement Groningen/Europapark routes. Suppliers must demonstrate experience with railway constructions, comply with ProRail standards, and be capable of working at the mentioned locations.

Meer uit aanbestedingen halen?

Met TenderView.ai krijg je AI-analyse, gepersonaliseerde aanbevelingen en dagelijkse e-mail alerts.

Gratis starten