Substation works
Liander, as the grid operator, must modernize a large number of Medium Voltage Rooms (MSRs) to meet current requirements regarding asbestos, electrical safety, and operational management. The assignment includes replacing or refurbishing transformers, MV switchgear, and associated installation components, and where necessary, adjusting the low-voltage installation. The goal is a safe, future-proof substation that complies with current policy. The procurement is a competitive procedure with negotiation, aimed at delivering a (touch) safe substation. The works require a combination of electrical, building, and safety expertise, with attention to asbestos removal and minimizing downtime. The contracting authority expects full project planning, quality assurance, and compliance with regulations.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
Liander, as the grid operator, must modernize a large number of Medium Voltage Rooms (MSRs) to meet current requirements regarding asbestos, electrical safety, and operational management. The assignment includes replacing or refurbishing transformers, MV switchgear, and associated installation components, and where necessary, adjusting the low-voltage installation. The goal is a safe, future-proof substation that complies with current policy. The procurement is a competitive procedure with negotiation, aimed at delivering a (touch) safe substation. The works require a combination of electrical, building, and safety expertise, with attention to asbestos removal and minimizing downtime. The contracting authority expects full project planning, quality assurance, and compliance with regulations.
As the grid operator, Liander manages electricity distribution. To this end, Liander manages a large number of Medium Voltage Rooms (MSR), most of which were built after the war. These MSRs often no longer meet current requirements regarding asbestos, electrical safety, and operational management. Parts of these installations must be modernized. In addition, if necessary, adjustments and renewals to the low-voltage installation must be carried out. This could include replacing the transformer and/or MV switchgear, including associated installation components. The goal is the delivery of a (to
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the core of the assignment for the Medium Voltage Rooms (MSR)?
What is the goal of the works in the substations?
What expertise is required for the execution of these works?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159