ClosedWorksEuropeanCompetitive procedure with negotiation

Substation works

Alliander N.V. · Competitive procedure with negotiation · 1 lots · 351773
Type
Works
45315700
Estimated value
€ 423M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Liander, as the grid operator, must modernize a large number of Medium Voltage Rooms (MSRs) to meet current requirements regarding asbestos, electrical safety, and operational management. The assignment includes replacing or refurbishing transformers, MV switchgear, and associated installation components, and where necessary, adjusting the low-voltage installation. The goal is a safe, future-proof substation that complies with current policy. The procurement is a competitive procedure with negotiation, aimed at delivering a (touch) safe substation. The works require a combination of electrical, building, and safety expertise, with attention to asbestos removal and minimizing downtime. The contracting authority expects full project planning, quality assurance, and compliance with regulations.

Works · Competitive procedure with negotiation · European procedure

European
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
€422,700,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendersubstation worksMedium Voltage Roomsasbestos

01What is being requested

Liander, as the grid operator, must modernize a large number of Medium Voltage Rooms (MSRs) to meet current requirements regarding asbestos, electrical safety, and operational management. The assignment includes replacing or refurbishing transformers, MV switchgear, and associated installation components, and where necessary, adjusting the low-voltage installation. The goal is a safe, future-proof substation that complies with current policy. The procurement is a competitive procedure with negotiation, aimed at delivering a (touch) safe substation. The works require a combination of electrical, building, and safety expertise, with attention to asbestos removal and minimizing downtime. The contracting authority expects full project planning, quality assurance, and compliance with regulations.

As the grid operator, Liander manages electricity distribution. To this end, Liander manages a large number of Medium Voltage Rooms (MSR), most of which were built after the war. These MSRs often no longer meet current requirements regarding asbestos, electrical safety, and operational management. Parts of these installations must be modernized. In addition, if necessary, adjustments and renewals to the low-voltage installation must be carried out. This could include replacing the transformer and/or MV switchgear, including associated installation components. The goal is the delivery of a (to

45315700€ 423MWorks
1Substation works€422,700,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€422,700,000

04Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9773×
2BAM Infra B.V.SME9377×
3ENGIE Infra & Mobility B.V.SME9269×
4VolkerRail Nederland B.V.SME9030×
5Hegeman Bouw & Infra B.V.SME8831×
6SPIE Nederland B.V.SME8823×

05Legal themes that may be relevant here

06Frequently asked questions

What is the core of the assignment for the Medium Voltage Rooms (MSR)?
The assignment involves modernizing Medium Voltage Rooms to meet current requirements for asbestos, electrical safety, and operational management. This includes replacing or refurbishing transformers, MV switchgear, and associated installation components, as well as any adjustments to the low-voltage installation.
What is the goal of the works in the substations?
The goal is the delivery of a (touch) safe and future-proof substation that complies with current policy.
What expertise is required for the execution of these works?
The works require a combination of electrical, building, and safety expertise, with specific attention to asbestos removal and minimizing downtime.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 423 mln

Gegunde waarden in CPV 45 · werken n=3159