New to Dutch tenders?

Bidding from abroad

Read our step-by-step guide on registering with TenderNed and Mercell, ESPD requirements, language rules, and how the TenderView.ai AI assistant answers questions in your own language.

Read the guide

Public Tenders

Search 8,910 tenders from the Dutch government. Including AI summaries, deadlines and contact details.

ClosedwerkenEU

Multifunctional gymnasium Willem Pijperstraat

Purpose: New gymnasium on the site of the demolished community center in Willem Pijperstraat. Status: closed, open procedure, CPV 45212222. Publication 25-05-2025, deadline 15-07-2025 12:00 UTC. Location NL366 (Vlaardingen). No recorded criticisms, documents, or amendments. The new building must comply with regional regulations and be used multifunctionally for sports, education, and social events.

ClosedwerkenEU

Framework Agreement Shore Power HIC

The tender concerns a framework agreement for the supply and installation of 150–200 shore power cabinets (low voltage) for the public (and private) berths of Havenbedrijf Rotterdam (HbR). HbR intends to enter into binding agreements with up to three parties for an initial term of three years, with flexible options up to eight years. The ROK will be awarded verbally to three parties. The first party to complete the execution will also receive a Further Agreement (NOK) for replacement.

ClosedwerkenEU

Area Development Nieuwe Sloot

Gemeente Alphen aan den Rijn25 mei 2025€ 11.000

The Municipality of Alphen aan den Rijn is conducting a non-public tender for the area development 'Nieuwe Sloot' (CPV 45210000). The municipality is selling approximately 3.9 hectares, requesting the market party to realize 340–350 homes within the Zoning Plan and to carry out public and infrastructure works. Upon completion, the municipality will take over the public area and infrastructure for € 1. The project must be completed by Q3 2028.

ClosedwerkenEU

Development of Schelfhorstdwarsweg location in Almelo

Gemeente Almelo25 mei 2025

The Municipality of Almelo has identified the northern part of the Schelfhorstdwarsweg as the intended location for the temporary reception of approximately 450 Ukrainian refugees. The site was chosen due to municipal ownership, sufficient size, and good accessibility. The reception is planned as a transitional solution to replace Huize Alexandra and De Banier and can be converted into permanent buildings or established as concept homes after the reception period ends. The project falls under a closed, non-public procedure with CPV number 45211000 (housing and reception services).

AwardedwerkenEU

Hoge Mors phase 2

Gemeente Leiden24 mei 2025

Municipality of Leiden has closed the project 'Hoge Mors fase 2'. It concerns a non-public works procedure in which the existing sewerage is being replaced, a separate sewerage system is being installed, residential streets and Smaragdlaan are being redesigned, climate adaptive measures are being implemented and greenery is being provided. Place of publication TenderNed Publication 379968 – value unknown.

ClosedwerkenEU

Framework Agreement Renovation WWTPs

Hoogheemraadschap Hollands Noorderkwartier has entered into a framework agreement for the renovation of 15 WWTPs. The tender concerns a multi-year investment program for major water chain maintenance 2025-2029 with a total scope of civil, mechanical, and electrical works, including bacteria gas installations, rake screens, dewatering installations, pumps, grit removal, tanks, aeration, and compressed air installations. Together with the aeration renewal, the market represents a budget of approximately €56 million and €30 million, respectively, but the exact value of the tender is unknown. Deadline is 21-07-2025 at 10:00 CET.

AwardedwerkenEU

Installing luminaires and replacing light masts for the rollout of LED lighting

The Municipality of Den Haag has completed an open public tender via TenderNed (ID 379943) for works (replacement of luminaires and light masts). The contract covers the implementation of energy-efficient LED luminaires and the replacement of approximately 5,000 light masts. The CPV code is 45316100 and the market status is indicated as 'awarded'; the specific value remains unknown.

Closedwerken

Area Midden - BBV Utrechtselijn 2026 L-005491

ProRail B.V.23 mei 2025

The contract ‘Area Midden – BBV Utrechtselijn 2026 L-005491’ was an **award via a multiple selective procedure** (ARN2016 Part III) concluded by ProRail B.V. The project is closed, current status = closed. No explicit deadline or value is known. The procedure falls under CPV code 45234000, focused on works (maintenance/construction). The EU cloud portal ‘Digitaal Aanbestedingen’ was used; the tender is registered digitally (European = no).

ClosedwerkenEU

Recognition scheme for contractors for the construction of drinking water transport pipelines

Oasen N.V.23 mei 2025

The tender concerns a recognition scheme for contractors wishing to participate in the construction of drinking water transport pipelines. The procedure is now closed and was a digital tender (TenderNed 379731). No specific CPV codes, contract value, or deadline are known. The description is concise and referred to the ‘Erkenningsleidraad’ for further details. The investigation focuses solely on the information provided.

Closedwerken

First-line maintenance Traffic Control Systems

Gemeente Den Haag23 mei 2025€ 4.000.000

The Municipality of Den Haag has 254 traffic control systems (approx. 100 on the main traffic network, approx. 150 on lower-order Hague roads). The current first-line maintenance is being carried out via a RAW framework agreement until 31-03-2025 by Dienst Stadsbeer. For the continuation of preventive and corrective maintenance (including installation technical adjustments and repair works), a national open tender (CPV 45316210) is being announced.

ClosedwerkenEU

Framework agreement public lighting 2025

Gemeente Utrecht23 mei 2025

Framework agreement for the supply, installation, connection, and replacement of public lighting, control cabinets, and cabling in the Municipality of Utrecht. Supply for new installation and replacement, tailored to a maximum period of 4 years. Completed and status closed.

Meer uit aanbestedingen halen?

Met TenderView.ai krijg je AI-analyse, gepersonaliseerde aanbevelingen en dagelijkse e-mail alerts.

Gratis starten