Solar Parks A12 Bunnik
Universiteit Utrecht and Energie Coöperatie Bunnik (ECB) are seeking a certified company for the design, implementation, and multi-year maintenance of two solar parks along the A12 in Bunnik. The project concerns a total installed capacity of approximately 16 MWp, distributed across two locations more than two kilometers from the Utrecht Science Park. The procurement follows a non-public procedure and requires an integrated approach in which design, construction, and operational management are outsourced jointly. The contractor must have demonstrable experience with large-scale PV installations, project management, construction and maintenance contracts, and knowledge of local regulations and grid connections. The company is expected to provide a sustainable maintenance plan, including monitoring, defect repair, and optimization of energy yield. The collaboration between UU and ECB is aimed at increasing efficiency and achieving economies of scale throughout the entire lifespan of the project.
Works · Restricted · European procedure
01What is being requested
Universiteit Utrecht and Energie Coöperatie Bunnik (ECB) are seeking a certified company for the design, implementation, and multi-year maintenance of two solar parks along the A12 in Bunnik. The project concerns a total installed capacity of approximately 16 MWp, distributed across two locations more than two kilometers from the Utrecht Science Park. The procurement follows a non-public procedure and requires an integrated approach in which design, construction, and operational management are outsourced jointly. The contractor must have demonstrable experience with large-scale PV installations, project management, construction and maintenance contracts, and knowledge of local regulations and grid connections. The company is expected to provide a sustainable maintenance plan, including monitoring, defect repair, and optimization of energy yield. The collaboration between UU and ECB is aimed at increasing efficiency and achieving economies of scale throughout the entire lifespan of the project.
The design, implementation, and multi-year maintenance of two solar parks along the A12 in Bunnik with a total installed capacity of approximately 16 MWp. It is intended to design, implement, and provide multi-year maintenance for two solar parks along the A12 in Bunnik with a total installed capacity of approximately 16 MWp. Solar park developer IX Zon has, after four years of development, offered a ready-to-build solar park in Bunnik at a distance of more than two kilometers from the Utrecht Science Park. This solar park offers opportunities for both Energie Coöperatie Bunnik (ECB) and Uni
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the scope of the project for the solar parks in Bunnik?
What is the objective of the joint procurement by Universiteit Utrecht and Energie Coöperatie Bunnik?
What does the assignment entail regarding the management of the solar parks?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln