OpenSuppliesEuropeanOpenGreen

Zero (0%) emission (collection) vehicles (2026)

Type
Supplies
34000000 · Transport equipment an
Estimated value
€ 13M
estimated
To deadline
-85d
Mar 23, 2026 · 11:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This tender concerns the selection of preferred suppliers for a Dynamic Framework Agreement for the supply of zero-emission collection vehicles to Midwaste members.

Supplies · Open · European procedure

Sustainability countsEuropean
Contract type
Supplies
Open
Estimated value
€13,000,000
estimated value
Submission deadline
March 23, 2026
11:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Transport equipment and related products
Location
Netherlands
CharacteristicsCPV 34SuppliesEU tenderGreen / SPP

01What is being requested

Supply and delivery ready-to-use of zero (0%) emission (collection) vehicles to various Midwaste members via a Dynamic Framework Agreement (DRO) for an indefinite period.

Request for quotation (Re)Procurement with a European open procedure for the selection of preferred suppliers for the supply of zero (0%) emission (collection) vehicles to various Midwaste members. A background: In 2021, a European procurement was first conducted for preferred suppliers for the supply of zero (0%) emission (collection) vehicles to various Midwaste members. Following this procurement, several market parties were contracted via a so-called Dynamic Framework Agreement (DRO). The DRO makes it possible for these market parties to compete for a contract via a mini-competition when

34000000€ 13MSupplies
1Zero (0%) emission (collection) vehicles (2026)€13,000,000

02Strategic insight

Strategic insight · AI analysis
<ul Ensure that technical expertise (MBO diplomas in specific fields) and the service infrastructure (distance and opening hours) are directly demonstrable. Take into account a maximum delivery time of 12 months from the date of order. Prepare for a two-step process where DRO admission only provides access to subsequent mini-competitions.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
Mini-competition: The final specifications and award system will only be disclosed per specific mini-competition.Important
No guarantee of delivery: Admission to the DRO does not provide a guarantee of delivery, only the guarantee to submit a bid during a mini-competition.Important
Service conditions: Strict requirements apply to response times, opening hours, and maximum delivery times.Important
Coordination: For category 1, the contractor is responsible for the steering coordination towards the bodybuilder.Important

04Can I take part?

Technical · 7
Possess at least 2 technical employees with MBO-level diplomas for each of the following fields: 1. battery electric or hydrogen electric drive, 2. electronics/electrical engineering, and 3. mechanics.Technical
The specified products are available to order immediately. Calculated from the date of order, the delivery time is a maximum of 12 months.Technical
Driving distance from the workshop or service support point for Chassis within 15 km (Municipality of Oss 25 km) and for the bodywork within 125 km to the respective Contracting Authority in accordance with www.routenet.nl Truck 40T/ Optimal.Technical
The opening hours of the workshop or service support point for repairs are at least 8:00-18:00 on working days and at least 4 hours on Saturday (in the morning).Technical
Possess a 24/7 service (fault) desk and guarantee availability.Technical
Maximum response time for faults (and commencement of repair) is 24 hours.Technical
Offering at least 1 year full warranty on all manufactured and/or applied parts.Technical
Other · 1
Contractor offers at least one product from one of the categories as described in the Product Range of which they are a (brand) dealer.Other

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

€13,000,000

07Likely competitors

#Likely bidderFitWins
1Terberg Matec Nederland B.V.SME9943×
2Scania Nederland B.V.SME9838×
3Truckland B.V.SME9725×
4BekkerLaGram Waalwijk B.V.SME9621×
5Aebi Schmidt Nederland B.V.SME9638×
6Kenbri Fire Fighting B.V.SME9131×

08Tender documents

Procedure.pdfpdfFeb 26, 2026 · 33 KB
UEA Coöperatieve Vereniging Midwaste Milieu U.A..pdfpdfFeb 26, 2026 · 90 KB
Huidige deelnemers aan de DRO - feb 2026.pdfpdfFeb 26, 2026 · 64 KB
Inschrijvingsfase.pdfpdfFeb 26, 2026 · 28 KB
Algemene informatie.pdfpdfFeb 26, 2026 · 44 KB
20260217 Concept DRO Zero (0%) emissie (inzamel)voertuigen 2026.pdfpdfFeb 26, 2026 · 192 KB
20220913 PvE Zero (0%) emissie (inzamel)voertuigen.pdfpdfFeb 26, 2026 · 76 KB
20260217 Opdrachtgevers en afnameprognose Zero (0%) emissie (inzamel)voertuigen 2026.pdfpdfFeb 26, 2026 · 157 KB
Eisen aan de uitvoering van de opdracht.pdfpdfFeb 26, 2026 · 30 KB
Uitsluitingsgronden.pdfpdfFeb 26, 2026 · 28 KB
20210719 Productengamma Zero (0%) emissie (inzamel)voertuigen.docxdocxFeb 26, 2026 · 83 KB
Algemene Inkoopvoorwaarden Midwaste september 2022.pdfpdfFeb 26, 2026 · 158 KB

09Legal themes that may be relevant here

10Frequently asked questions

What does the Dynamic Framework Agreement (DRO) entail?
The DRO works in two steps: first, suitable preferred suppliers are selected for admission to the agreement. Subsequently, competition takes place via mini-competitions for specific assignments when there is a need among the Midwaste members.
How long is the term of the framework agreement?
The agreement is entered into for an indefinite period, with a mutual notice period of one (1) month.
How can new market parties join the DRO?
New market parties can join the DRO annually through a new public procedure. This occurs at least once a year to avoid hindering competition and market forces.
Which suitability criteria are used for suppliers?
Suppliers must have demonstrable experience in the development, supply, or maintenance of zero-emission vehicles, possess the necessary financial viability, and comply with relevant EU regulations for vehicles and emission standards (such as NEN, EN, ISO).
Do already contracted parties need to re-tender?
Parties already contracted for a specific category do not need to re-tender. Parties wishing to apply for a different category must re-tender for this procurement.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 280K
median
€ 606K
p75
€ 1,6 mln
€ 13 mln

Gegunde waarden in CPV 34 · leveringen n=1101