AwardedWorksEuropeanRestrictedGreen

Reconstruction works MFC De Wanmolen in Zetten

Gemeente Overbetuwe · Restricted · 1 lots · 361213
Type
Works
45210000
Estimated value
€ 9,00M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Overbetuwe intends to replace the current sports and community center De Wanmolen and the Bibliotheek Zetten with a renewed Multi-functional Centre (MFC) at the same location. The new building will include a community room/café, library, event spaces, space for associations, a youth room, a sports hall, and primary healthcare providers (general practitioners, pharmacy, midwives, child health clinic). The contract focuses on circular demolition, building, and installation works. The existing Wanmolen will be demolished circularly; harvested materials will be reused. Emphasis is placed on sustainable, bio-based, and climate-adaptive construction, with a focus on nature-inclusive design and preparation for energy-neutral operation. The tender is not-public and requires an integrated approach to demolition, construction, and installations, with attention to quality, safety, environmental, and energy objectives.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€9,000,000
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPcircular demolitionsustainable constructionbio-based materials

01What is being requested

The Municipality of Overbetuwe intends to replace the current sports and community center De Wanmolen and the Bibliotheek Zetten with a renewed Multi-functional Centre (MFC) at the same location. The new building will include a community room/café, library, event spaces, space for associations, a youth room, a sports hall, and primary healthcare providers (general practitioners, pharmacy, midwives, child health clinic). The contract focuses on circular demolition, building, and installation works. The existing Wanmolen will be demolished circularly; harvested materials will be reused. Emphasis is placed on sustainable, bio-based, and climate-adaptive construction, with a focus on nature-inclusive design and preparation for energy-neutral operation. The tender is not-public and requires an integrated approach to demolition, construction, and installations, with attention to quality, safety, environmental, and energy objectives.

The current sports and community center De Wanmolen and Bibliotheek Zetten in Zetten will be replaced by a renewed Multi-functional Centre (MFC) at the location of the current Wanmolen. The new multi-functional centre consists of: a community room/café, library, event spaces, space for associations, youth room, sports hall, and primary healthcare providers such as a general practitioner center, pharmacy, midwifery practice, and child health clinic. There is a broad emphasis on sustainability. The existing Wanmolen will be demolished circularly and harvested materials will be reused in the new

45210000Works
1Reconstruction works MFC De Wanmolen in Zetten

02Outcome

Awarded

van der Horst bouw en onderhoud B.V.

Award value
€9,000,000
Bidders
3

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9973×
2Van Gelder BVSME9853×
3BAM Infra B.V.SME9777×
4Boskalis Nederland B.V.SME9769×
5KWS Infra B.V.SME9692×
6BINX Smartility B.V.SME9627×

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the works for the reconstruction of MFC De Wanmolen?
The contract includes the circular demolition of the existing Wanmolen, the building works, and the installation works for the new multi-functional centre.
Which sustainability objectives apply to this project?
Emphasis is placed on circular demolition where harvested materials are reused, the use of sustainable and bio-based materials, nature-inclusive and climate-adaptive building, and preparation for energy-neutral operation.
Which functions will be included in the new multi-functional centre?
The new building will house a community room/café, library, event spaces, space for associations, a youth room, a sports hall, and primary healthcare providers such as a general practitioner center, pharmacy, midwifery practice, and child health clinic.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159