Waterbedrijf Groningen and North Water are seeking a contractor for the realization of an extensive network of water pipelines in the northeast of Groningen. The project includes a drinking water pipeline, an industrial water pipeline for the Eemshaven area, a pressurized sewage system connecting the Eemshaven area to the existing network of Waterschap Noorderzijlvest, and a raw water pipeline transporting intake water from the Eemskanaal to the industrial water treatment plant at RWZI Garmerwolde. The contract is subject to a competitive procedure with negotiation and focuses on full realization, including design, construction, testing, and delivery. The contractor must comply with Dutch water legislation, environmental and safety standards, and work closely with the involved water boards and the RWZI. Emphasis is placed on quality, reliability, timely delivery, and cost control.

Works · Competitive procedure with negotiation · European procedure

European
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderwater pipelinewater supplyEemshaven

01What is being requested

Waterbedrijf Groningen and North Water are seeking a contractor for the realization of an extensive network of water pipelines in the northeast of Groningen. The project includes a drinking water pipeline, an industrial water pipeline for the Eemshaven area, a pressurized sewage system connecting the Eemshaven area to the existing network of Waterschap Noorderzijlvest, and a raw water pipeline transporting intake water from the Eemskanaal to the industrial water treatment plant at RWZI Garmerwolde. The contract is subject to a competitive procedure with negotiation and focuses on full realization, including design, construction, testing, and delivery. The contractor must comply with Dutch water legislation, environmental and safety standards, and work closely with the involved water boards and the RWZI. Emphasis is placed on quality, reliability, timely delivery, and cost control.

Waterbedrijf Groningen and North Water jointly intend to install various water pipelines for the purpose of the water supply in the northeast of the province of Groningen. The responsibility for the realization of the project ‘watervoorziening noordoost Groningen’ lies with Waterbedrijf Groningen. The project includes the following pipelines: ◦A drinking water pipeline for the maintenance of the robust water supply in the area. ◦An industrial water pipeline for supply to customers in the Eemshaven area. ◦A pressurized sewage system for the connection of the Eemshaven area to the existing netw

45231112Works

02Outcome

Awarded

Strukton Civiel West BV

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1BAM Infra B.V.SME9677×
2Boskalis Nederland B.V.SME9670×
3ENGIE Infra & Mobility B.V.SME9669×
4Dura Vermeer Infra Regionale Projecten BVSME9658×
5KWS Infra B.V.SME9592×
6Heijmans Infra B.V.SME9565×

06Legal themes that may be relevant here

07Frequently asked questions

What specific infrastructure is being installed for the Eemshaven area?
For the Eemshaven area, an industrial water pipeline for supply to customers and a pressurized sewage system for connection to the existing network of Waterschap Noorderzijlvest are being realized.
What is the function of the raw water pipeline in this project?
The raw water pipeline serves for the transport of intake water from the Eemskanaal from the intake works to the industrial water treatment plant, located at RWZI Garmerwolde of Waterschap Noorderzijlvest.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159