OpenWorksRestrictedGreen

Shore power supply Werkendam harbour

Gemeente Altena · Restricted · 1 lots · 412967
Type
Works
45315300 · Electricity supply ins
Estimated value
Not published
To deadline
-82d
Mar 26, 2026 · 10:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This document is a technical standard specification for shore power cabinets for inland shipping, with detailed requirements for housing, electrical components, control, and communication protocols.

Works · Restricted · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
March 26, 2026
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Electricity supply installations
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPshore powerharbourelectrical cabinet

01What is being requested

This document contains a standard technical specification for the supply and execution of shore power cabinets for inland shipping. The standard distinguishes three types of facilities: bronze, silver and gold, varying in functionality from transaction and consumption registration to full remote management including UPS and monitoring of temperature and humidity.

The current shore facilities are outdated, and the wish is therefore to offer the shore power supplies as sustainably, user-friendly, on-demand, and reliably as possible to users. The contracting authority is looking for one market party that can fully support the municipality in both the replacement of the existing shore power supply in Werkendam and in the expansion of future shore (power) facilities. The contractor must be able to perform the services described below integrally and for a longer period.

45315300Works
1Shore power supply Werkendam harbour

02Strategic insight

Strategic insight · AI analysis
<ul Ensure full compliance with the technical specifications per type (bronze, silver or gold), as the functionality of the controller and the interfaces are directly dependent on the chosen category. Pay close attention to the certification requirements, such as the MID certification for energy meters and conformity with NEN1010 for the Dutch market. Take into account the sustainability requirements of components, such as the minimum lifespan of 10 years for UPS batteries and the mechanical/electrical cycles of protection devices.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 8
The shore power cabinet must be located at least 1.5 m from the water's edge.Important
Subsidence or tilting of the cabinet must not occur for a period of at least 10 years.Important
The housing must be vandal-resistant with a minimum value of IK-10.Important
When using stainless steel, it is advised to apply stainless steel 316 in salt, brackish, and (heavy) industry.Important
The installation must comply with NEN1010 and additional chapter 730 for the Netherlands.Important
The energy meter must comply with the EN 50470 (MID) directive and the certification must be submitted.Important
The controller must support data transfer via fiber optic or mobile communication with a fixed IP address.Important
For the gold type, the UPS power supply must meet a requested autonomy of 4 hours.Important

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9792×
2Combinatie Heijmans - SWARCOUnknown9773×
3Heijmans Infra B.V.SME9665×
4ENGIE Infra & Mobility B.V.SME9669×
5Boskalis Nederland B.V.SME9569×
6Dura Vermeer Infra Regionale Projecten BVSME9558×

06Tender documents

Selectieleidraad Walstroomvoorziening Haven Werkendam d.d. 19 februari 2026 met kenmerk K011359pdfFeb 19, 2026 · 1094 KB
Bijlage 3 Rapportage voorzieningenpdfFeb 19, 2026 · 2312 KB
TN572942 - EFE3 Vrijwillige aankondiging van een opdracht 20260219170401pdfFeb 19, 2026 · 143 KB
uea_572942_20260219165456pdfFeb 19, 2026 · 324 KB
Bijlage 2 Verklaring referentie voor kerncompetentiedocxFeb 19, 2026 · 21 KB
Bijlage 4 Verklaring referentie selectiecriteriadocxFeb 19, 2026 · 28 KB
Bijlage 6 Standaard technisch bestek voor een walstroomkast voor de binnenvaart- Versie 1.3pdfFeb 19, 2026 · 1034 KB
Bijlage 5 Klachtenregeling aanbestedingen gemeente AltenadocxFeb 19, 2026 · 41 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the core of the assignment for the shore power supply in Werkendam?
The assignment entails the replacement of the outdated shore facilities and the realization of future expansions. The municipality is looking for one market party that can provide integral, sustainable, and reliable support for both the replacement and the future expansion of the shore power supplies.
Which requirements must the proposed solution meet?
The solution for the shore power supply must be sustainable, user-friendly, reliable, and available on demand. The contractor must be able to perform the required services integrally and for a longer period.
Which suitability criteria are important for the bidder?
Important criteria are experience with similar shore power projects, the ability to enter into a long-term relationship, and compliance with the technical specifications as included in Annex 6.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159