Waterschap Rivierenland (WSRL) is seeking a contractor to provide mobile full-service pump installations on call, with a capacity of 90 to 300 m³/min. The installations must include transport, installation, commissioning, maintenance, fault follow-up, and standby capabilities. Additionally, the pump must be linked to WSRL's water level control via telemetry, be equipped with control facilities, a water level control function, and a fuel level meter. The assignment is intended for emergencies, such as extremely wet or dry periods, or in the event of failure of existing pumps and pumping stations. The tender is public and concerns deliveries. WSRL must take into account water safety, agricultural interests, nature management, and local residents. The contractor must provide a complete package, including transport, installation, maintenance, and telemetry integration, and must be able to respond quickly to emergency situations.
Supplies · Open · European procedure
01What is being requested
Waterschap Rivierenland (WSRL) is seeking a contractor to provide mobile full-service pump installations on call, with a capacity of 90 to 300 m³/min. The installations must include transport, installation, commissioning, maintenance, fault follow-up, and standby capabilities. Additionally, the pump must be linked to WSRL's water level control via telemetry, be equipped with control facilities, a water level control function, and a fuel level meter. The assignment is intended for emergencies, such as extremely wet or dry periods, or in the event of failure of existing pumps and pumping stations. The tender is public and concerns deliveries. WSRL must take into account water safety, agricultural interests, nature management, and local residents. The contractor must provide a complete package, including transport, installation, maintenance, and telemetry integration, and must be able to respond quickly to emergency situations.
WSRL is responsible for ensuring the proper functioning of the water system within its management area. In doing so, the water authority must take various interests into account, such as water safety, the agricultural sector, nature management, and the interests of local residents. WSRL requires temporary, mobile pump installations during emergencies. For example: - During extremely wet or dry periods, to supplement existing pumping stations in order to maintain the water level at the desired level, - In the event of failure of existing pumps and/or (sewage) pumping stations. The contractor sh
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the intended capacity of the mobile pump installations?
Which services must be provided when the pumps are deployed?
What technical requirements must the pump installation meet?
In which situations will the mobile pump installations be deployed?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 300K
€ 800K
€ 4,0 mln