voluntary transparency Wind turbine Kampen
The procedure for the realization and maintenance of a wind turbine on the grounds of the Rioolwaterzuiveringsinstallatie in Kampen is closed and has started without prior announcement. The waterschap Drents Overijssels Delta is preparing for a negotiation procedure with ENERCON GmbH, which includes the installation of the turbine and the foundation, followed by a minimum 15-year service with optional extensions.
Works · Onderhandeling zonder bekendmaking · European procedure
01What is being requested
The procedure for the realization and maintenance of a wind turbine on the grounds of the Rioolwaterzuiveringsinstallatie in Kampen is closed and has started without prior announcement. The waterschap Drents Overijssels Delta is preparing for a negotiation procedure with ENERCON GmbH, which includes the installation of the turbine and the foundation, followed by a minimum 15-year service with optional extensions.
By means of this prior notice of voluntary transparency, waterschap Drents Overijssels Delta wishes to inform companies of the intention to initiate a negotiation procedure without prior announcement, as referred to in Article 2.32 paragraph 1 sub b under 2 in conjunction with Article 2.32 paragraph 3 of the Aanbestedingswet, to award the realization and maintenance of a wind turbine on the grounds of the Rioolwaterzuiveringsinstallatie (RWZI) in Kampen. The realization of the wind turbine also includes the realization of the wind turbine foundation. The maintenance of the wind turbine will be
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What does the contract for the wind turbine in Kampen entail?
What is the intended duration of the maintenance?
With which party does the waterschap intend to start the procedure?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159