ClosedWorksEuropeanOnderhandeling zonder bekendmaking

Voluntary prior transparency Realisation Temporary Operating Centre UMCG

Universitair Medisch Centrum Groningen (UMCG) · Onderhandeling zonder bekendmaking · 1 lots · 360141
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The University Medical Center Groningen (UMCG) intends to realise a Temporary Operating Centre (TOC) within a period of 10 years to free up space for a permanent operating complex. The assignment concerns a construction project (works) and is carried out via a negotiated procedure without publication, whereby competition is limited. The TOC must comply with strict medical construction standards, including hygiene, ventilation, fire safety, and accessibility. Additionally, the design must be modular and flexible, so that it can be adapted or dismantled after 10 years without major structural interventions. The project requires an integrated approach with existing infrastructure, energy efficiency, and sustainable materials. The tender focuses on a small to medium-sized enterprise (SME) with expertise in medical constructions, project management, and innovative construction solutions. The procedure follows Dutch and EU regulations for negotiated procedure without publication, ensuring transparency and equality of bids.

Works · Onderhandeling zonder bekendmaking · European procedure

European
Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderTemporary operating centreUMCGmedical infrastructure

01What is being requested

The University Medical Center Groningen (UMCG) intends to realise a Temporary Operating Centre (TOC) within a period of 10 years to free up space for a permanent operating complex. The assignment concerns a construction project (works) and is carried out via a negotiated procedure without publication, whereby competition is limited. The TOC must comply with strict medical construction standards, including hygiene, ventilation, fire safety, and accessibility. Additionally, the design must be modular and flexible, so that it can be adapted or dismantled after 10 years without major structural interventions. The project requires an integrated approach with existing infrastructure, energy efficiency, and sustainable materials. The tender focuses on a small to medium-sized enterprise (SME) with expertise in medical constructions, project management, and innovative construction solutions. The procedure follows Dutch and EU regulations for negotiated procedure without publication, ensuring transparency and equality of bids.

The UMCG intends to realise a Temporary Operating Centre for a period of 10 years, in order to create space in the central medical complex for the realisation of a permanent operating complex.

45000000Works
1Voluntary prior transparency Realisation Temporary Operating Centre UMCG

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME9634×
2Heijmans Utiliteit B.V.SME9627×
3Croonwolter&dros B.V.SME9625×
4BINX Smartility B.V.SME9427×
5Unica Installatietechniek B.V.SME9213×
6Facilicom Solutions B.V.SME8714×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the realisation of the Temporary Operating Centre?
The realisation of a Temporary Operating Centre serves to free up space in the central medical complex for the realisation of a permanent operating complex.
For what period is the Temporary Operating Centre being realised?
The Temporary Operating Centre is intended for a period of 10 years.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159