Voluntary transparency bridges Havenkwartier
The Municipality of Zeewolde intends to have a new electrically operated bicycle/pedestrian bridge (bridge E) designed and realized in the Havenkwartier via a negotiated procedure without publication. The foundation is already present; the bridge must match the appearance of the existing bridge F. Bridge F, originally manually operated, must also be converted to be electrically operated. The assignment includes the full design, construction, and installation of the operation, while maintaining the original requirements regarding safety, comfort, and architecture. Additional works necessary to execute the original assignment may be carried out without loss of costs or work. The procedure falls under 'negotiated procedure without publication', meaning the tender will not be made public. The municipality expects an integrated solution that aligns both technically and aesthetically with the existing infrastructure.
Works · Onderhandeling zonder bekendmaking · National procedure
01What is being requested
The Municipality of Zeewolde intends to have a new electrically operated bicycle/pedestrian bridge (bridge E) designed and realized in the Havenkwartier via a negotiated procedure without publication. The foundation is already present; the bridge must match the appearance of the existing bridge F. Bridge F, originally manually operated, must also be converted to be electrically operated. The assignment includes the full design, construction, and installation of the operation, while maintaining the original requirements regarding safety, comfort, and architecture. Additional works necessary to execute the original assignment may be carried out without loss of costs or work. The procedure falls under 'negotiated procedure without publication', meaning the tender will not be made public. The municipality expects an integrated solution that aligns both technically and aesthetically with the existing infrastructure.
1. An agreement has been reached with the contractor regarding: works for the two bicycle/pedestrian bridges known as bridge E and F in the Havenkwartier (Polderwijk) of Zeewolde. Bridge E is a new bridge to be constructed, electrically operated, for which the foundation has already been realized. This bridge must be designed and realized such that the appearance of bridge E matches bridge F. Bridge F was previously realized by the Municipality of Zeewolde. Due to evolving insights, this must be converted from manual operation to electrical operation. 2. At the time of executing the assign
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Frequently asked questions
What is the specific assignment regarding bridge E and bridge F?
What aesthetic and technical requirements must the bridges meet?
Automatically compiled from the official tender data and documents.
05Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159