ClosedWorksOnderhandeling zonder bekendmaking

Voluntary transparency bridges Havenkwartier

Gemeente Zeewolde · Onderhandeling zonder bekendmaking · 1 lots · 357911
Type
Works
45221100
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Zeewolde intends to have a new electrically operated bicycle/pedestrian bridge (bridge E) designed and realized in the Havenkwartier via a negotiated procedure without publication. The foundation is already present; the bridge must match the appearance of the existing bridge F. Bridge F, originally manually operated, must also be converted to be electrically operated. The assignment includes the full design, construction, and installation of the operation, while maintaining the original requirements regarding safety, comfort, and architecture. Additional works necessary to execute the original assignment may be carried out without loss of costs or work. The procedure falls under 'negotiated procedure without publication', meaning the tender will not be made public. The municipality expects an integrated solution that aligns both technically and aesthetically with the existing infrastructure.

Works · Onderhandeling zonder bekendmaking · National procedure

Contracting authority
Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksbicycle bridgeelectrically operatedHavenkwartier

01What is being requested

The Municipality of Zeewolde intends to have a new electrically operated bicycle/pedestrian bridge (bridge E) designed and realized in the Havenkwartier via a negotiated procedure without publication. The foundation is already present; the bridge must match the appearance of the existing bridge F. Bridge F, originally manually operated, must also be converted to be electrically operated. The assignment includes the full design, construction, and installation of the operation, while maintaining the original requirements regarding safety, comfort, and architecture. Additional works necessary to execute the original assignment may be carried out without loss of costs or work. The procedure falls under 'negotiated procedure without publication', meaning the tender will not be made public. The municipality expects an integrated solution that aligns both technically and aesthetically with the existing infrastructure.

1. An agreement has been reached with the contractor regarding: works for the two bicycle/pedestrian bridges known as bridge E and F in the Havenkwartier (Polderwijk) of Zeewolde. Bridge E is a new bridge to be constructed, electrically operated, for which the foundation has already been realized. This bridge must be designed and realized such that the appearance of bridge E matches bridge F. Bridge F was previously realized by the Municipality of Zeewolde. Due to evolving insights, this must be converted from manual operation to electrical operation.   2. At the time of executing the assign

45221100Works
1Voluntary transparency bridges Havenkwartier

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9492×
2BAM Infra B.V.SME9377×
3Dura Vermeer Infra Regionale Projecten BVSME9258×
4Van Gelder BVSME9253×
5Boskalis Nederland B.V.SME9169×
6SPIE Nederland B.V.SME9123×

04Frequently asked questions

What is the specific assignment regarding bridge E and bridge F?
The assignment includes the design and realization of a new, electrically operated bicycle/pedestrian bridge (bridge E) and the conversion of the existing manually operated bridge F to an electrically operated variant. For bridge E, the foundation is already present.
What aesthetic and technical requirements must the bridges meet?
The appearance of the new bridge E to be constructed must match the existing bridge F. The realization of the bridge and the operation shall take place in compliance with the original requirements regarding safety, comfort, and architecture.

Automatically compiled from the official tender data and documents.

05Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159