Prior Information Notice Jetty 4 Yukonhaven

Havenbedrijf Rotterdam NV · 1 lots · 357818
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the design and realization of a new jetty (Jetty 4) in the Yukonhaven, Havenbedrijf Rotterdam NV. The jetty must be 160 m long, suitable for ocean-going vessels and inland navigation with a current depth of -10 m, with the possibility of future deepening to -13 m NAP. Additionally, a 200 m long quay wall (combi-wall) will be constructed on the north side of the port, connecting to Jetty 3. Various mooring poles and walkways are to be realized, along with a 145 m long breakwater and significant dredging, coastal, and shore works to expand the port (approx. 450,000 m³). The assignment requires an integrated approach to maritime infrastructure, where design, construction, and coastal protection must be closely aligned. Execution requires expertise in maritime construction, coastal protection, and inland waterway infrastructure, with attention to future expansion possibilities and environmental requirements.

Works · European procedure

European
Contracting authority
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderjetty constructionmarine dredgingbreakwater

01What is being requested

The tender concerns the design and realization of a new jetty (Jetty 4) in the Yukonhaven, Havenbedrijf Rotterdam NV. The jetty must be 160 m long, suitable for ocean-going vessels and inland navigation with a current depth of -10 m, with the possibility of future deepening to -13 m NAP. Additionally, a 200 m long quay wall (combi-wall) will be constructed on the north side of the port, connecting to Jetty 3. Various mooring poles and walkways are to be realized, along with a 145 m long breakwater and significant dredging, coastal, and shore works to expand the port (approx. 450,000 m³). The assignment requires an integrated approach to maritime infrastructure, where design, construction, and coastal protection must be closely aligned. Execution requires expertise in maritime construction, coastal protection, and inland waterway infrastructure, with attention to future expansion possibilities and environmental requirements.

The scope includes the design and realization of nautical infrastructure, which broadly concerns: [bullet] A jetty with a length of approx. 160 m for ocean-going vessels and inland navigation with a NGD of approx. -10 m, with the possibility to deepen this in the future to approx. NAP -13 m; [bullet] A quay wall / earth-retaining structure (combi-wall) of approx. 200 m on the north side of the Yukonhaven (connection to jetty 3); [bullet] Construction of various mooring poles and walkways; [bullet] Construction of a breakwater of approx. 145 m in length; [bullet] Dredging works and coastal and

45000000Works
1Prior Information Notice Jetty 4 Yukonhaven

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9665×
2Van Hattum & Blankevoort N.V.SME9619×
3Boskalis Nederland B.V.SME9569×
4Van Oord Nederland BVSME9519×
5KWS Infra B.V.SME9492×
6SPIE Nederland B.V.SME9423×

05Legal themes that may be relevant here

06Frequently asked questions

What is the extent of the planned nautical infrastructure in the Yukonhaven?
The assignment includes the realization of a jetty of approx. 160 m for ocean-going vessels and inland navigation, a quay wall (combi-wall) of approx. 200 m on the north side, various mooring poles and walkways, and a breakwater of approx. 145 m in length.
Which dredging and shore works are part of the assignment?
The scope includes dredging works and coastal and shore works for the expansion of the current Yukonhaven with a volume of approx. 450,000 m³.
What are the specifications regarding the depth of the new jetty?
The jetty will have a NGD of approx. -10 m, whereby there must be the possibility to deepen it in the future to approx. NAP -13 m.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159