Prior Information Notice Jetty 4 Yukonhaven
The tender concerns the design and realization of a new jetty (Jetty 4) in the Yukonhaven, Havenbedrijf Rotterdam NV. The jetty must be 160 m long, suitable for ocean-going vessels and inland navigation with a current depth of -10 m, with the possibility of future deepening to -13 m NAP. Additionally, a 200 m long quay wall (combi-wall) will be constructed on the north side of the port, connecting to Jetty 3. Various mooring poles and walkways are to be realized, along with a 145 m long breakwater and significant dredging, coastal, and shore works to expand the port (approx. 450,000 m³). The assignment requires an integrated approach to maritime infrastructure, where design, construction, and coastal protection must be closely aligned. Execution requires expertise in maritime construction, coastal protection, and inland waterway infrastructure, with attention to future expansion possibilities and environmental requirements.
Works · European procedure
01What is being requested
The tender concerns the design and realization of a new jetty (Jetty 4) in the Yukonhaven, Havenbedrijf Rotterdam NV. The jetty must be 160 m long, suitable for ocean-going vessels and inland navigation with a current depth of -10 m, with the possibility of future deepening to -13 m NAP. Additionally, a 200 m long quay wall (combi-wall) will be constructed on the north side of the port, connecting to Jetty 3. Various mooring poles and walkways are to be realized, along with a 145 m long breakwater and significant dredging, coastal, and shore works to expand the port (approx. 450,000 m³). The assignment requires an integrated approach to maritime infrastructure, where design, construction, and coastal protection must be closely aligned. Execution requires expertise in maritime construction, coastal protection, and inland waterway infrastructure, with attention to future expansion possibilities and environmental requirements.
The scope includes the design and realization of nautical infrastructure, which broadly concerns: [bullet] A jetty with a length of approx. 160 m for ocean-going vessels and inland navigation with a NGD of approx. -10 m, with the possibility to deepen this in the future to approx. NAP -13 m; [bullet] A quay wall / earth-retaining structure (combi-wall) of approx. 200 m on the north side of the Yukonhaven (connection to jetty 3); [bullet] Construction of various mooring poles and walkways; [bullet] Construction of a breakwater of approx. 145 m in length; [bullet] Dredging works and coastal and
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the extent of the planned nautical infrastructure in the Yukonhaven?
Which dredging and shore works are part of the assignment?
What are the specifications regarding the depth of the new jetty?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159