ClosedWorksEuropeanOpenGreen

VON.01.01.RE | Framework agreement Variable Maintenance on various provincial roads in the period 2025-2026

Provincie Noord-Brabant · Open · 1 lots · 338980
Type
Works
45200000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

Framework agreement for variable maintenance on provincial roads where the emphasis lies on the execution of four sub-assignments and sustainability via a sustainability plan.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

The assignment concerns a framework agreement for variable maintenance on various provincial roads, including the execution of four specific sub-assignments.

The province of Noord-Brabant intends to enter into a framework agreement for the purpose of variable maintenance (VON). This will allow for targeted maintenance to be carried out on provincial roads.n/n- RAW framework agreement based on UAV 2012n- procurement procedure: European Publicn- BPKV: 1 award criterion 'sustainability plan' likely between € 2,000,000-€ 3,000,000 fictitious discount.

45200000Works
1Framework agreement Variable Maintenance on various provincial roads in the period 2025-2026

02Strategic insight

Strategic insight · AI analysis
When focusing on the Sustainability Plan, concentrate on optimizations and measurable added value instead of merely acceleration. Ensure that the use of emission-free equipment is described in a smart and targeted manner to increase the quality score. Take nighttime execution into account in the calculation of costs.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
Works take place largely during nighttime hours or weekends.Important
The use of emission-free equipment must amount to at least 30% throughout the entire duration.Important
Extra use of emission-free equipment above the contract requirement will not be taken into account.Important
The bank guarantee from the original specification will lapse.Important
The soil released during works must be transported to a facility and the contractor becomes the owner.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Award criteria

Quality criterion 1weight n/a

Assessment of the Sustainability Plan, whereby the manner and extent to which emission-free equipment is used in a smart, efficient, and targeted way within the four sub-assignments is evaluated.

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Combinatie Heijmans - SWARCOUnknown10073×
3Boskalis Nederland B.V.SME10069×
4Van Gelder BVSME10053×
5D. van der Steen B.V.SME10031×
6BAM Infra B.V.SME9877×

08Tender documents

TN471247 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250428094228pdfApr 29, 2025 · 13 KB
2e NvI VON.01 DEF(241011)pdfOct 17, 2024 · 341 KB
TN471247 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20241016092734pdfOct 16, 2024 · 13 KB
Bijlagen bij 2e NvI VON.01zipOct 15, 2024 · 773 KB
Nota van inlichtingen 2024-09-12-1pdfSep 16, 2024 · 39 KB
TN471247 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240912083550pdfSep 12, 2024 · 13 KB
Bijlagen bij NvI-1_stuknummer_5986995zipSep 12, 2024 · 7305 KB
1e NvI VON.01 DEF(240904)_stuknummer_5986994pdfSep 12, 2024 · 339 KB
TN471247 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240705093320pdfJul 7, 2024 · 13 KB
VON.01.01.RE_Model Inschrijvingsleidraad_5953414_definitief_1.0pdfJul 5, 2024 · 24981 KB
Bewerkbare_Bijlagen_VON.01_01. Model Inschrijvingsleidraadversie 4.0_datum_19juni2023_stuknummer5285045_bijlage hernummerddocxJul 5, 2024 · 4559 KB
P.N. VON.01rsxJul 5, 2024 · 4358 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the award criterion for this assignment?
The assignment is awarded based on the award criterion 'sustainability plan'. This will likely be valued with a fictitious discount between € 2,000,000 and € 3,000,000.
Under what conditions will the works be carried out?
The works are largely carried out during nighttime hours or on weekends. Therefore, the tender costs must be based on nighttime hours.
How should the closure at intersections and roundabouts be handled?
For the tender, an average work section length of approximately 250 meters can be assumed for a closure for the purpose of an intersection and/or roundabout.
Is an overview of roads with a collision obligation (botsplicht) available?
No, the contracting authority does not have an overview map available indicating which roads are subject to a collision obligation.
What legal basis underlies the framework agreement?
The framework agreement for variable maintenance (VON) is a RAW framework agreement based on the UAV 2012.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159