Replacement of Achterhakkers quay
The Municipality of Dordrecht intends to replace the quay wall at Achterhakkers using a construction team. The Ingenieursbureau has prepared a Preliminary Design (VO), which the contracting authority must develop into a Final Design (D) and an Execution Design (UO). Subsequently, a specification must be drawn up and the works executed. The works primarily consist of installing sheet piles from the water, after which the new sheet piles will be backfilled with soil or sand. The assignment is open and aimed at full delivery from design to execution. The contracting authority expects an integrated approach in which design, specification, and execution align seamlessly, with attention to flood safety, structural stability, and environmental aspects.
Works · Open · National procedure
01What is being requested
The Municipality of Dordrecht intends to replace the quay wall at Achterhakkers using a construction team. The Ingenieursbureau has prepared a Preliminary Design (VO), which the contracting authority must develop into a Final Design (D) and an Execution Design (UO). Subsequently, a specification must be drawn up and the works executed. The works primarily consist of installing sheet piles from the water, after which the new sheet piles will be backfilled with soil or sand. The assignment is open and aimed at full delivery from design to execution. The contracting authority expects an integrated approach in which design, specification, and execution align seamlessly, with attention to flood safety, structural stability, and environmental aspects.
The contract to be awarded concerns the replacement of the quay wall at Achterhakkers in Dordrecht. Through a construction team, the Contracting Authority wishes to develop the Preliminary Design (VO) prepared by the Ingenieursbureau for the replacement of the quay wall at Achterhakkers in Dordrecht into a Final Design (D), an Execution Design (UO), a specification, and subsequently to actually execute the works. For this purpose, sheet piles must primarily be installed from the water, and subsequently, the area behind these new sheet piles must be backfilled with soil/sand.
02Value in context
03Likely competitors
04Legal themes that may be relevant here
05Frequently asked questions
What is the exact scope of the works for the replacement of the Achterhakkers quay?
What approach is being used for the execution of this project?
Are there specific requirements regarding sustainability?
Automatically compiled from the official tender data and documents.
06Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159