Oasen N.V. intends to replace and optimize the lighting fixtures at all its locations. The 2017–2018 inventory round demonstrated that many fixtures, used for various applications (site, facade, general, emergency, and escape route lighting), are approaching the end of their technical service life and are showing defects. The contract concerns the supply of new, energy-efficient fixtures that comply with Dutch safety and quality standards, including integration with existing control systems. The supplier must provide installation, adjustment, testing, documentation, warranty, and training. The objective is a sustainable, low-maintenance lighting solution that reduces operational costs and ensures safety.
Supplies · European procedure
01What is being requested
Oasen N.V. intends to replace and optimize the lighting fixtures at all its locations. The 2017–2018 inventory round demonstrated that many fixtures, used for various applications (site, facade, general, emergency, and escape route lighting), are approaching the end of their technical service life and are showing defects. The contract concerns the supply of new, energy-efficient fixtures that comply with Dutch safety and quality standards, including integration with existing control systems. The supplier must provide installation, adjustment, testing, documentation, warranty, and training. The objective is a sustainable, low-maintenance lighting solution that reduces operational costs and ensures safety.
Oasen's locations are equipped with a wide diversity of lighting fixture types for site lighting, facade lighting, general lighting, emergency lighting, and escape route indicators. Due to an increase in the number of defects, an inventory round was conducted per location in 2017–2018 to map the current state and scope. This round revealed that: a. The lighting fixtures are showing defects due to approaching the end of their technical service life.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of this contract?
What types of lighting are being replaced within this contract?
Why is the replacement of the lighting fixtures necessary?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 260K
€ 526K
€ 1,4 mln
Gegunde waarden in CPV 31 · leveringen n=168