Sustainability of Public Lighting Municipality of Oirschot (verledden)
Framework agreement for the supply, assembly, and installation of lighting luminaires and masts for the Municipality of Oirschot. The contract will be awarded on the basis of the lowest price for a maximum period of three years.
Supplies · Open · European procedure
01What is being requested
This concerns a RAW framework agreement for the sustainability of public lighting in the Municipality of Oirschot. The work includes the supply of masts and luminaires, the replacement, mounting, and connection of lighting objects, the implementation of traffic measures, the coordination of work on the regulated network, and the provision of mutation and revision data. The agreement has an initial term of two calendar years (2026 and 2027) with an option for extension of one year (2028) and a maximum contract value of € 1,500,000.00 (excluding VAT).
The Municipality of Oirschot aims to have fully completed its public lighting sustainability program by the end of 2027. The completion of the sustainability program entails that approximately 1,700 lighting luminaires and 430 light masts must be supplied and installed. The sustainability program is entirely based on LED technology. For this assignment, the contracting authority wishes to enter into a framework agreement with 1 contracting party. The equipment to be supplied and the work to be performed are established in the work specification (RAW system). The supply and work must take place
02Strategic insight
<ul Focus on competitive pricing as the award is based solely on the lowest price. Ensure that the technical references (minimum 800 luminaires within 12 months within 3 years) and the VGM certificate are immediately available for verification. Prepare the Social Return implementation to enable agreements to be made within 7 working days immediately after the award.
03Points of attention
04Can I take part?
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Award criteria
The bid will be assessed on the basis of the lowest price. A higher quality level or other criteria provide no added value for the municipality.
07Value in context
08Likely competitors
09Tender documents
10Legal themes that may be relevant here
11Frequently asked questions
What is the scope of the materials and work to be supplied?
What experience requirements must bidders meet?
What is the deadline for the completion of the sustainability program?
In what manner will the assignment be executed?
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
€ 260K
€ 526K
€ 1,4 mln
Gegunde waarden in CPV 31 · leveringen n=168