CancelledWorksOpen

Renovation of attic Lycee Francais d'Amsterdam

Type
Works
Estimated value
Not published
To deadline
-439d
Apr 10, 2025
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This report describes the fire safety assessment for the renovation of the third floor and a stairwell of the French school in Amsterdam.

Works · Open · National procedure

Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
April 10, 2025
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorks

01What is being requested

The contract concerns the renovation of a school on the third floor and a stairwell to the second floor at Rustenburgerstraat 246 in Amsterdam.

Renovation of the attic of the Lycée Francais d'Amsterdam from storage space to two educational classrooms.

Works

02Strategic insight

Strategic insight · AI analysis
Ensure that all materials used are provided with a product certificate to meet fire safety requirements. Coordinate the necessary fire-resistant cladding and the position of the fire brigade entrance closely with the structural engineer and the competent authority.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The applied materials must be demonstrated by means of a valid product certificate from the supplier.Important
The structural components must be provided with any necessary fire-resistant cladding in consultation with the structural engineer.Important
The collection and flow capacity of the escape route must be additionally tested against article 4.81.Important
The presence and position of the fire brigade entrance and the staging area must be determined in consultation with the competent authority.Important
The fire alarm system may need to be expanded for the third floor in accordance with NEN 2535.Important

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Likely competitors

#Likely bidderFitWins
1Du Prie Bouw & Ontwikkeling B.V. potentialSME38
2Aannemersbedrijf Kormelink potentialUnknown38
3A. de Jong Installatietechniek B.V. potentialSME37
4De Vries en Verburg Bouw B.V. potentialSME36
5Verstappen-Van Amelsvoort B.V. potentialSME36
6Formabouw B.V. potentialSME36

06Tender documents

TN512957 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250509164758pdfMay 9, 2025 · 7 KB
TN512957 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250409105246pdfApr 9, 2025 · 7 KB
Blg4_087 BV660-A Principedetails houtvezelpdfMar 28, 2025 · 2970 KB
Blg1_SchoolkalenderpdfMar 28, 2025 · 204 KB
087 BV675 Nota van InlichtingpdfMar 28, 2025 · 159 KB
Blg8_Rustenburgerstraat 246 Amsterdam asbestinventarisatie (2)pdfMar 28, 2025 · 1097 KB
Blg3_087 BV650-651-A FragmentpdfMar 28, 2025 · 662 KB
Blg7_20221019_Asbestinventarisatie Rustenburgerstraat 246 te AmsterdampdfMar 28, 2025 · 3942 KB
Blg2_087 BV600-630-A OverzichtpdfMar 28, 2025 · 3115 KB
Blg6_240772-01ApdfMar 28, 2025 · 189 KB
Blg9_087 BV672-A RuimteafwerkstaatpdfMar 28, 2025 · 50 KB
Blg5_240772-berekening-ApdfMar 28, 2025 · 3049 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the specific content of the renovation?
The contract concerns the renovation of the attic of the Lycée Français d'Amsterdam, in which an existing storage space is converted into two classrooms.
Which usage functions apply to the construction plan?
The following usage functions are included in the construction plan: assembly function, educational function, and another usage function.
What requirements apply to structural safety in case of fire?
The resistance to collapse of the building structures after the renovation must be at least the same as in the existing state, with a minimum resistance to collapse of 30 minutes.
On which floors does the renovation take place?
The renovation takes place on the third floor and also includes a stairwell to the second floor.

Automatically compiled from the official tender data and documents.