Renovation of P3 into an integrated music center
Gemeente Purmerend · Restricted · 1 lots · 337977
5
5 of 6 core insights found
Measures presence, not accuracy · documents remain authoritative
ScopeAdvicePoints of attentionSuitability requirementsAward criteriaTimeline
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high
This concerns a non-public EU procurement for the renovation of Poppodium P3 into an integrated music center in Purmerend. The contract includes various building works and has tight realization dates.
Works · Restricted · European procedure
EuropeanComplete timeline
CharacteristicsCPV 45WorksEU tender
01What is being requested
The contract concerns the renovation of the Poppodium P3 building in Purmerend into an integrated music center. The works include, among other things, modifying the entrance, catering facilities, facades, and the realization of a lift and additional floor area.
The contract concerns the renovation of the Poppodium P3 building, located at Purmersteenweg 17-19 in Purmerend, into an integrated music center.
1Renovation of P3 into an integrated music center—
02Strategic insight
Strategic insight · AI analysis
Ensure a timely application for a TenderNed account to avoid missing the deadline. Take into account the limited space for the execution of the works. Integrate the social return directly into the preparation of the plan.
03Points of attention
Important · 5
A social return obligation of 1% of the contract sum applies.Important
Accessibility may be affected by urgent works on the A7 bridge.Important
The execution period is limited due to the closure of the building between October 2024 and August 2025.Important
There is a prohibition on Russian involvement during execution.Important
Requests to participate must be submitted via TenderNed.Important
04Can I take part?
Financial · 1
Financial and economic standingFinancial
Professional capability · 1
Professional competenceProfessional capability
Technical · 1
Technical abilityTechnical
05Exclusion grounds
Exclusion grounds — consult the ESPD
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Process & timeline
Selection phase
juni 2024
Sending provisional selection decision
juli 2024
Tender phase: Sending invitation
augustus 2024
Tender phase: Final receipt of invitation
September/oktober 2024
Award phase: Provisional award
oktober 2024
Award phase: Final award
november 2024
Realization: Planned start of execution
november 2024
Realization: Planned completion
oktober 2025
Final receipt of questions
11 juni 2024
Publication of memorandum of information 1
18 juni 2024
Final receipt of requests to participate
2 juli 2024
Opening of the vault of requests to participate
2 juli 2024
Beoordelen selectie
16 juli 2024
Versturen voorlopige selectiebeslissing
23 juli 2024
Aanleveren gevraagde bewijsstukken
30 juli 2024
Einde standstill periode
5 augustus 2024
Verzenden definitieve selectiebeslissing
8 augustus 2024
Versturen van uitnodiging tot inschrijving
9 augustus 2024
Beschikbaar stellen gunningsleidraad
07-08-2024
Uiterlijke ontvangst vragen
06-09-2024
07Value in context
Estimate not published
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
08Likely competitors
#Likely bidderFitWins
1KWS Infra B.V.SME9792×
2BAM Infra B.V.SME9777×
3Dura Vermeer Infra Regionale Projecten BVSME9758×
4BINX Smartility B.V.SME9727×
5Van Gelder BVSME9753×
6Kernbouw B.V.SME9711×
09Tender documents
TN464415 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20260225091624pdfFeb 26, 2026 · 144 KB
Bijlage 2 Model Referenties 1.1docxJun 24, 2024 · 32 KB
Selectieleidraad Verbouwing Poppodium P3 1.2pdfJun 18, 2024 · 746 KB
Nota van inlichtingen 2024-06-18-2pdfJun 18, 2024 · 10 KB
TN464415 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240618150443pdfJun 18, 2024 · 13 KB
TN464415 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240530142721pdfMay 31, 2024 · 11 KB
Bijlage 5 Uitvoeringsprotocol social return on investment Zaanstreek-Waterland 2020pdfMay 31, 2024 · 667 KB
Bijlage 1 Uniform Europees AanbestedingsdocumentpdfMay 31, 2024 · 1527 KB
Bijlage 3 KMA klachtenregeling 2022 v1.0pdfMay 31, 2024 · 253 KB
Bijlage 4 Verklaring geen sprake van Russische betrokkenheid v2docxMay 31, 2024 · 52 KB
Bijlage 6a Versterking Brug A7_veelgestelde_vragen_en_antwoorden_dec_2023pdfMay 31, 2024 · 181 KB
Bijlage 6b Versterking_brug_a7_over_noordhollandsch_kanaalpdfMay 31, 2024 · 928 KB
10Legal themes that may be relevant here
Advies 48> Europese niet-openbare procedure voor werktuigkundige en elektrotechnische installaties van de nieuwbouw van een multifunctionelAdvies 53> Europese openbare procedure voor een overheidsopdracht tot het verrichten van diensten bestaande uit (dagelijks en periodiek) scAdvies 63> Meervoudig onderhandse aanbesteding voor het reinigen van wegen, straten en pleinen. Kan bij gunning op laagste prijs de indieniAdvies 98> Europese openbare aanbestedingsprocedure voor een raamovereenkomst met één ondernemer voor het vervangen van armaturen (straatveAdvies 97> Europese openbare procedure met betrekking tot de vervanging van kunstwerken. Is de door de aanbestedende dienst opgegeven '
11Frequently asked questions
What is the purpose of the renovation of Poppodium P3?
The contract concerns the renovation of the Poppodium P3 building into an integrated music center to improve the operation of the pop venue.
On which criteria is the selection of candidates based?
The selection takes place based on two criteria: the general approach regarding planning (maximum score 60) and the general approach regarding environmental management (maximum score 40).
Which selection criteria are used in this procurement?
Two selection criteria are used: the general approach regarding planning with a maximum score of 60, and the general approach regarding environmental management with a maximum score of 40.
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
p25
€ 1,4 mln
€ 1,4 mln
median
€ 3,6 mln
€ 3,6 mln
p75
€ 9,1 mln
€ 9,1 mln
deze opdracht
Gegunde waarden in CPV 45 · werken n=3159