Transport of residue and bottom ash

AEB Amsterdam · Open · 2 lots · 417529
Type
Services
90514000 · Waste recycling servic
Estimated value
€ 9,50M
estimated
To deadline
-42d
May 5, 2026 · 12:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

This procurement concerns the transport of residue and bottom ash divided into two lots for AEB Amsterdam. The award will be made on the basis of the best price-quality ratio.

Services · Open · European procedure

European
Contracting authority
Contract type
Services
Open
Estimated value
€9,500,000
estimated value
Submission deadline
May 5, 2026
12:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Waste recycling services
Location
Netherlands
CharacteristicsCPV 90ServicesEU tenderTransportWaste processingBottom ash

01What is being requested

The transport of two lots: Lot 1 concerns the transport of residue from the separation plant to the waste bunker of the waste incineration plant (approximately 260,000 tonnes per year) and Lot 2 concerns the transport of bottom ash from the slag bunker to the depot.

With this public EU procurement, AEB aims to conclude agreements for: Lot 1: The transport of residue from the separation plant to the AVI. Lot 2: The transport of bottom ash from the AVI storage bunker to the AEB site.

90514000€ 9,50MServices
1Lot 1 Transport residue separation plant€7,850,000
2Lot 2 Transport bottom ash€1,650,000

02Breakdown by lot

Lot 1 Transport residue separation plant€7,850,000
Lot 2 Transport bottom ash€1,650,000

03Strategic insight

Strategic insight · AI analysis
Ensure optimal use of resources; the contracting authority has the explicit wish to further optimize the deployment of drivers and vehicles beyond the intended 24/7 deployment. Take into account the strict safety requirements during the site inspection and the operational requirement that unloading capability must always be available at the cascade installation. Note the restriction on subcontracting, as a maximum of two subcontractors are permitted due to the operational nature.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 7
Communication must take place exclusively digitally via Mercell.Important
Bids submitted not via Mercell will be excluded.Important
During the site inspection, it is mandatory to bring specific safety equipment (including class 2 workwear, S3 safety footwear, helmet, goggles, and P3 dust mask).Important
The contractor may deploy a maximum of two subcontractors.Important
For Lot 1, it is essential that a non-full trailer is always positioned under one of the filling stations to prevent downtime.Important
Bids must be submitted exclusively in the Dutch language.Important
The validity period of the bid is 90 days.Important

05Can I take part?

Other · 14
The Bidder must have read and agreed to the definitions as attached.Other
The Bidder must have read and agreed to the general information about the Contracting Authority.Other
The Bidder must have read and agreed to the rules regarding communication via Mercell.Other
The Bidder must have read and agreed to the rules regarding digital procurement via Mercell.Other
The Bidder must have read and agreed to the rules regarding the structure of the bid and procurement compliance.Other
The Bidder must have read and agreed to the rules regarding the site inspection.Other
The Bidder must have read and agreed to the rules regarding contradictions and/or objections.Other
The Bidder must have read and agreed to the rules regarding questions and information.Other
The Bidder must have read and agreed to the rules regarding single bidding.Other
The Bidder may not submit a manipulative or conditional bid.Other
The Bidder must have read and agreed to the rules regarding the validity period.Other
The Bidder must have read and agreed to the rules regarding the language requirements.Other
The Bidder must have read and agreed to the rules regarding the legal form.Other
The Bidder must have read and agreed to the rules regarding bidding truthfully.Other

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Award criteria

Best price-quality ratioweight n/a

Assessment of the bids will take place on the basis of price and qualitative aspects.

08Value in context

€9,500,000

09Likely competitors

#Likely bidderFitWins
1Renewi Nederland B.V.SME100133×
2Remondis Nederland BVSME10047×
3GP Groot inzameling en recycling bvSME10028×
4SITA Recycling Services Noord B.V.SME9948×
5Attero B.V.SME9724×
6M. van Happen Transport B.V.SME9619×

10Tender documents

Opdrachtomschrijving en contractuele voorwaarden.pdfpdfApr 23, 2026 · 46 KB
Uitsluitingsgronden & Uniform Europees Aanbestedingsdocument (UEA).pdfpdfApr 23, 2026 · 50 KB
Bijlage Tevredenheidsverklaring.docxdocxApr 23, 2026 · 32 KB
Inkoopvoorwaarden AEB Exploitatie B.V versie juli 2019.pdfpdfApr 23, 2026 · 196 KB
P2 PvE Bijlage 2 Tonnage bodemas per jaar, week, dag.xlsxxlsxApr 23, 2026 · 40 KB
Bijlage Onderaanneming.docxdocxApr 23, 2026 · 31 KB
UEA AEB Amsterdam.pdfpdfApr 23, 2026 · 90 KB
Planning.pdfpdfApr 23, 2026 · 46 KB
Bijlage Holdingverklaring.docxdocxApr 23, 2026 · 27 KB
P2 PvE Bijlage 1 Plattegrond AEB met legenda.pdfpdfApr 23, 2026 · 173 KB
Geschiktheidseisen.pdfpdfApr 23, 2026 · 52 KB
Beschrijving.pdfpdfApr 23, 2026 · 43 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the specific content of the transport assignments?
The assignment consists of two parts: the transport of residue from the separation plant to the discharge floor of the incineration plant, and the transport of approximately 340,000 tonnes of bottom ash per year from the AVI storage bunker to the AEB site.
Which safety requirements must the contractor comply with?
Contractors and their employees (including subcontractors) must respect the 'Golden rules for your safety' of AEB Amsterdam. This includes, among other things, working with a valid work permit, performing gas measurements where required, and not working under the influence of alcohol or drugs.
Which selection and suitability criteria apply?
Bidders must possess the transport capacity for both the residue from the separation plant and the bottom ash from the AVI storage bunker. In addition, compliance with safety and environmental standards for waste transport is required.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 214K
median
€ 466K
p75
€ 1,2 mln
€ 9,5 mln

Gegunde waarden in CPV 90 · diensten n=2216