Total Engineering new construction Kindcentrum de Vaart Heerhugowaard
This guide provides a uniform language and framework for circular construction within the sector via nine specific indicators.
Services · Restricted · European procedure
01What is being requested
It concerns the application of the HNN Nieuwbouw 1.1 framework for circular performance in the realization of buildings.
Total Engineering new construction Kindcentrum de Vaart Heerhugowaard. Stichting Blosse Onderwijs intends to realize a new Kindcentrum in Heerhugowaard. The new kindcentrum will house primary school De Vaart, childcare, a gymnasium, and various spaces for meeting, care, and prevention. To facilitate the realization of the design, a Total Engineering contract is being tendered.
02Strategic insight
Focus on achieving the performance levels per specific indicator such as MPG and disassembly capability. Ensure a design that aligns with the material transition and the desired circular principles. Take the building layers into account to stimulate high-quality reuse.
03Points of attention
04Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
05Award criteria
Design and construction with as low a possible MPG based on the Environmental Performance of Buildings Determination Method.
Design and construction with as low a possible material-related CO2 emission in accordance with the Paris Proof calculation methodology.
Design and construction with as high a possible CO2 storage in biobased building materials.
Design and construction with as high a possible share of responsible origin materials such as biobased, reused, or recycled.
Design and construction with as high a possible share of healthy materials that are demonstrably non-toxic.
Design and construction with as little residual material released as possible during construction.
Design and construction with as large a possible degree of adaptive capacity for adjustability during the service life.
Design and construction with as high a possible disassembly capability of products, components, and materials.
Design and construction with as large a possible reuse potential at the end of the service life.
06Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
07Likely competitors
08Tender documents
09Legal themes that may be relevant here
10Frequently asked questions
What is the scope of the Total Engineering contract for Kindcentrum de Vaart?
Which technical requirements must the design of the kindcentrum meet?
Which technical aspects are covered in the standards for the new construction?
What are the required documents for a valid submission?
Automatically compiled from the official tender data and documents.
11Estimated value versus the market
€ 341K
€ 992K
€ 6,5 mln
Gegunde waarden in CPV 71 · diensten n=2713