Tailtrack area lighting Gein (replacement of masts, luminaires and cables, design and installation work)
GVB Infra B.V. wishes to replace the existing area lighting installation on the tailtrack at the Gein passenger station. The assignment includes the removal, transport, storage, and installation of various lighting luminaires, light masts, power cables, cable support systems, fire-resistant seals, and an outdoor enclosure with switching and distribution equipment including back-up power. Additionally, the new installation must be designed, the cables must be connected to the low-voltage distributor, and the old components must be safely dismantled and disposed of. The scope is detailed in the Program of Requirements, Annex 2. The procedure is a negotiated procedure, allowing a limited number of certified suppliers to be approached. The works require precise coordination with the metro and station infrastructure and must comply with safety and fire-resistance requirements. The contracting authority expects an integrated solution that improves lighting quality and reduces maintenance costs.
Works · Onderhandse procedure · National procedure
01What is being requested
GVB Infra B.V. wishes to replace the existing area lighting installation on the tailtrack at the Gein passenger station. The assignment includes the removal, transport, storage, and installation of various lighting luminaires, light masts, power cables, cable support systems, fire-resistant seals, and an outdoor enclosure with switching and distribution equipment including back-up power. Additionally, the new installation must be designed, the cables must be connected to the low-voltage distributor, and the old components must be safely dismantled and disposed of. The scope is detailed in the Program of Requirements, Annex 2. The procedure is a negotiated procedure, allowing a limited number of certified suppliers to be approached. The works require precise coordination with the metro and station infrastructure and must comply with safety and fire-resistance requirements. The contracting authority expects an integrated solution that improves lighting quality and reduces maintenance costs.
GVB RIB wants to have the existing area lighting installation on the tailtrack at the Gein passenger station replaced. The lighting installation consists of, among other things: • Lighting luminaires on walkways; • Lighting luminaires along and between metro tracks; • Emergency exit luminaires along metro tracks; • Light masts along and between metro tracks; • Power cables along and between metro tracks; • An outdoor enclosure with switching and distribution equipment (incl. back-up power); • Cable support systems in the passenger station; • Fire-resistant seals for cable penetrations
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Legal themes that may be relevant here
05Frequently asked questions
What is the exact scope of the replacement of the area lighting at Gein station?
Which works regarding the existing installation are part of the assignment?
What is the expected technical integration of the new lighting installation?
Automatically compiled from the official tender data and documents.
06Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159