Drafting and as-built work and drawing management
The Centraal Orgaan opvang Asielzoekers (COA) intends to select one supplier via a framework agreement for drafting and as-built work and the management of drawings. The assignment is a service contract of a public nature, under which the COA has the possibility to place orders within the framework agreement. The supplier must have experience with technical drawings and be able to provide a suitable document management system. The agreement is intended to provide the COA with a reliable partner for the preparation, modification, and archiving of drawings, including version control and quality control.
Services · Open · European procedure
01What is being requested
The Centraal Orgaan opvang Asielzoekers (COA) intends to select one supplier via a framework agreement for drafting and as-built work and the management of drawings. The assignment is a service contract of a public nature, under which the COA has the possibility to place orders within the framework agreement. The supplier must have experience with technical drawings and be able to provide a suitable document management system. The agreement is intended to provide the COA with a reliable partner for the preparation, modification, and archiving of drawings, including version control and quality control.
The COA wishes to enter into a Framework Agreement with one (1) Supplier, within which the COA can award the Assignment for the execution of the drafting and as-built work and the drawing management.
02Outcome
People Power B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What is the purpose of the framework agreement?
What does the assignment for drawing management entail?
Which activities will be carried out under the agreement?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 341K
€ 992K
€ 6,5 mln
Gegunde waarden in CPV 71 · diensten n=2713