AwardedServicesEuropeanCompetitive procedure with negotiation

Student Information System for DCTerra, Noorderpoort and Alfa college

Stichting Drenthe College Terra · Competitive procedure with negotiation · 373178
Type
Services
72260000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This document provides an overview of the current application landscape and the interfaces with the central student information system Magister. Additionally, the implementation conditions for Social Return within the Groningen labor market region are described.

Services · Competitive procedure with negotiation · European procedure

European
Contracting authority
Contract type
Services
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 72ServicesEU tender

01What is being requested

It describes the configuration of the current application landscape and the various interfaces with the Student Information System (SIS), Magister, within the educational institutions.

Selection Student Information System (SIS) for DCTerra, Noorderpoort and Alfa-college

72260000Services

02Outcome

Awarded

Topicus Onderwijs Eduarte B.V.

Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure a sound plan of approach for the Social Return implementation in consultation with the account manager. Take into account the specific building blocks and the associated financial values for the various target groups. Ensure that the reporting is timely and complete via the official monitor.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
The contractor is responsible for the Social Return accountability and reporting in the Social Return Monitor.Important
Social Return must not lead to the displacement of regular jobs at the contractor.Important
Costs for an intermediary are for the account of the contractor and cannot be charged.Important
The full accountability must be entered no later than one month after the conclusion of the agreement.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

07Bidders in this segment

#Likely bidderFitWins
1Afas Software B.V.SME9832×
2Centric Netherlands B.V.SME9556×
3Bechtle direct B.V.SME9425×
4KPN B.V.SME8927×
5Conclusion B.V.SME8818×
6PQR B.V.SME8826×

08Tender documents

TN518773 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20251219085255pdfDec 21, 2025 · 140 KB
Nota van Inlichtingen, fase 1 20250418-1 (final)xlsxApr 18, 2025 · 65 KB
TN518773 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250414083959pdfApr 14, 2025 · 8 KB
Nota van Inlichtingen, fase 1, SIS 20250409-1xlsxApr 9, 2025 · 62 KB
Selectieleidraad SIS-oplossing voor DNA (final)pdfApr 3, 2025 · 724 KB
uea_518773_20250401163623pdfApr 3, 2025 · 1591 KB
TN518773 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250401164212pdfApr 3, 2025 · 7 KB
Bijlage 7.1.2 Huidig SIS-landschap Alfa-collegepdfApr 3, 2025 · 1420 KB
Bijlage 7.2 Referentiesjabloon 20250321-1docxApr 3, 2025 · 95 KB
Bijlage 7.4 Uitvoering Social Return 3.0 - 2025pdfApr 3, 2025 · 304 KB
Bijlage 7.1.1 DCTerra SIS Applicatielandschap & koppelingenpdfApr 3, 2025 · 1578 KB
Bijlage 7.1.3 Huidig SiS-landschap NoorderpoortpdfApr 3, 2025 · 2377 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the purpose of the Social Return obligation within this assignment?
Social Return is an approach to generate Social Impact and create more employment for people in vulnerable positions on the labor market, for example by offering jobs, work-study positions and internships.
How is the monitoring of the Social Return efforts carried out?
Monitoring is conducted in the Social Return Monitor. The contractor will receive an email to create an account after the project has been included in the Social Return Monitor by the contracting authority.
Is it possible to deviate from the standard building blocks for Social Return?
Yes, if it is not possible to fulfill the obligation using building blocks, customized activities may be used as an alternative implementation in consultation with the linked account manager and after approval by the contracting authority.
Which components are part of the SIS application landscape?
The application landscape includes, among others, the Core Student Registration system (KRS), the Student Tracking System, the attendance registration system and the intake system.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 327K
median
€ 800K
p75
€ 2,5 mln
deze opdracht

Gegunde waarden in CPV 72 · diensten n=1436