AwardedServicesEuropeanOpen

Street and gully cleaning

Gemeente Gooise Meren · Open · 1 lots · 352582
Type
Services
90610000
Estimated value
€ 8,50M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Gooise Meren wishes to enter into a framework agreement for periodic street and gully cleaning. The works are aimed at preventing pollution of the public space, ensuring sufficient water drainage, and protecting the sewerage system. The timing of the works must closely align with the seasonal growth of weeds and leaf litter. By making a single party responsible, the municipality can manage results more consistently and adjust where necessary. The assignment requires an integrated approach, in which the contractor coordinates the planning, execution, monitoring, and reporting, while the contracting authority remains in the lead.

Services · Open · European procedure

European
Contracting authority
Contract type
Services
Open
Estimated value
€8,500,000
estimated value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 90ServicesEU tenderstreet cleaninggully cleaningpublic space

01What is being requested

The Municipality of Gooise Meren wishes to enter into a framework agreement for periodic street and gully cleaning. The works are aimed at preventing pollution of the public space, ensuring sufficient water drainage, and protecting the sewerage system. The timing of the works must closely align with the seasonal growth of weeds and leaf litter. By making a single party responsible, the municipality can manage results more consistently and adjust where necessary. The assignment requires an integrated approach, in which the contractor coordinates the planning, execution, monitoring, and reporting, while the contracting authority remains in the lead.

Many works in the public space are interconnected. For example, if weeds on paving are not sufficiently removed, the public space will quickly become polluted. This affects the discharge capacity of gullies and consequently the water drainage capacity of the sewerage system, which can be exacerbated in autumn by insufficient deployment for leaf sweeping. Therefore, the timing is closely linked. The works must be carried out periodically in a 'sequence' (treintje).​€Gooise Meren has therefore decided to tender these works in a single Framework Agreement. The result is that only one party is res

90610000€ 8,50MServices
1Main assignment€8

02Outcome

Awarded

Jos Scholman Groen B.V.

Bidders
4

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€8,500,000

05Bidders in this segment

#Likely bidderFitWins
1Vandervalk+degroot B.V.SME9866×
2Veeg- en Rioolbedrijf Adriaans BVSME9825×
3De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9615×
4CSU B.V.SME93181×
5Renewi Nederland B.V.SME92133×
6Rions B.V.SME9117×

06Legal themes that may be relevant here

07Frequently asked questions

What is the purpose of the framework agreement for street and gully cleaning?
The purpose is to achieve a clean public space and sufficient water drainage of gullies and sewerage through an efficient, integrated way of working.
How is the execution of the works organized?
The works are carried out in a periodic 'sequence' (treintje). The contractor is responsible for the coordination of planning, execution, monitoring, and reporting, while the contracting authority remains in the lead.
Why was a single integrated framework agreement chosen?
By tendering the works in one framework agreement, there is only one party responsible for the execution. This enables the municipality to manage results more consistently.
What is the relationship between the different cleaning tasks?
The timing of the works is closely linked; insufficient removal of weeds on paving affects the discharge capacity of gullies, which is exacerbated in autumn by the deployment for leaf sweeping.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 214K
median
€ 466K
p75
€ 1,2 mln
€ 8,5 mln

Gegunde waarden in CPV 90 · diensten n=2216