The Province of Noord-Holland has issued a tender for the construction of a new ‘Stolperbrug’. The project concerns the construction of a bridge over a waterway or infrastructure, with a focus on safety, sustainability, and aesthetics. The procurement is conducted via a competitive dialogue, allowing the contracting authority to realize an optimal solution in consultation with selected bidders. The works include design, engineering, material supply, construction, inspection, and delivery. The contractor is expected to comply with Dutch construction standards (NEN), the Spatial Planning Act, and environmental protection requirements. The project duration is approximately 18 to 24 months, with a budget of approximately €5 million. The contracting authority emphasizes transparency, quality, and the involvement of local stakeholders.

Works · Competitive dialogue · European procedure

European
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderbridgeinfrastructureconstruction

01What is being requested

The Province of Noord-Holland has issued a tender for the construction of a new ‘Stolperbrug’. The project concerns the construction of a bridge over a waterway or infrastructure, with a focus on safety, sustainability, and aesthetics. The procurement is conducted via a competitive dialogue, allowing the contracting authority to realize an optimal solution in consultation with selected bidders. The works include design, engineering, material supply, construction, inspection, and delivery. The contractor is expected to comply with Dutch construction standards (NEN), the Spatial Planning Act, and environmental protection requirements. The project duration is approximately 18 to 24 months, with a budget of approximately €5 million. The contracting authority emphasizes transparency, quality, and the involvement of local stakeholders.

--

45221100Works
1Stolperbrug

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9892×
2BAM Infra B.V.SME9677×
3Combinatie Heijmans - SWARCOUnknown9573×
4Boskalis Nederland B.V.SME9569×
5Heijmans Infra B.V.SME9565×
6ENGIE Infra & Mobility B.V.SME9569×

05Legal themes that may be relevant here

06Frequently asked questions

What is the expected duration of the project?
The expected duration of the project is approximately 18 to 24 months.
What does the execution of the assignment entail?
The works include the design, engineering, material supply, construction, inspection, and final delivery.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht