ClosedServicesMarktconsultatieGreen

Stimulation and trial actions Slim & Schoon Onderweg

Groene Metropoolregio Arnhem - Nijmegen · Marktconsultatie · 1 lots · 319426
Type
Services
79300000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Groene Metropoolregio Arnhem‑Nijmegen intends to develop a stimulation and trial action for the use of bicycles and alternative modes of transport through a market consultation. The assignment includes an e-bike and speedpedelec trial for employees, a regional challenge, and for the A12 Slim Reizen sub-project, a broader trial aimed at residents and an action that stimulates all alternatives to peak-hour car travel (cycling, different travel times, carpooling, working from home, public transport, walking). The consultation aims to gain insight into solution directions, collaboration and scaling-up possibilities, and input for the final procurement, contract type, and execution. The region is looking for a future-proof, market-conform approach that can sustainably improve mobility in the region.

Services · Marktconsultatie · National procedure

Sustainability counts
Contract type
Services
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 79ServicesGreen / SPPe-bikespeedpedelecbicycle approach

01What is being requested

The Groene Metropoolregio Arnhem‑Nijmegen intends to develop a stimulation and trial action for the use of bicycles and alternative modes of transport through a market consultation. The assignment includes an e-bike and speedpedelec trial for employees, a regional challenge, and for the A12 Slim Reizen sub-project, a broader trial aimed at residents and an action that stimulates all alternatives to peak-hour car travel (cycling, different travel times, carpooling, working from home, public transport, walking). The consultation aims to gain insight into solution directions, collaboration and scaling-up possibilities, and input for the final procurement, contract type, and execution. The region is looking for a future-proof, market-conform approach that can sustainably improve mobility in the region.

Slim & Schoon Onderweg intends to stimulate the use of bicycles among employees as part of the employer approach. Part of the bicycle stimulation approach is an e-bike and speedpedelec trial action and a regional challenge for companies and their employees. As part of the aforementioned action from the employer approach, there is also a need for 2 additional products for 1 of the sub-areas of Slim & Schoon Onderweg, namely for the Arnhem-German border region - the A12 Slim Reizen sub-project. These are: • an e-bike and speedpedelec trial action that focuses not only on employees but also on

79300000Services
1Stimulation and trial actions Slim & Schoon Onderweg

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

03Likely competitors

#Likely bidderFitWins
1Bender Detachering B.V.SME94107×
2Antea Nederland BVSME8835×
3BlueTrail B.V.SME8226×
4Sweco Nederland B.V. SME8223×
5Arcadis Nederland B.V.SME7832×
6Maandag Interim Professionals B.V.SME60387×

04Legal themes that may be relevant here

05Frequently asked questions

What is the purpose of the Slim & Schoon Onderweg market consultation?
The market consultation aims to gain insight into possible solution directions, the degree of collaboration and scaling-up between parties, and to collect input for the design of the final procurement, contract type, and contract execution.
Which specific activities fall under the employer approach?
The employer approach includes stimulating the use of bicycles among employees through an e-bike and speedpedelec trial action and a regional challenge for companies and their employees.
What are the additional requirements for the A12 Slim Reizen sub-project?
For the A12 Slim Reizen sub-project, there is a need for an e-bike and speedpedelec trial action aimed at both employees and residents, and a stimulation action for all alternatives to the car during peak hours, such as cycling, different travel times, carpooling, working from home, public transport, and walking.
Which aspects of the future procurement are being tested?
The region wants to design the procurement so that it fits the developments in the market and is future-proof, whereby its own assumptions and starting points are tested.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 200K
median
€ 640K
p75
€ 3,0 mln
deze opdracht

Gegunde waarden in CPV 79 · diensten n=4949