AwardedWorksRestricted

Stations - Renovation platform canopy Middelburg

ProRail B.V. · Restricted · 343084
Type
Works
45200000
Estimated value
€ 2,47M
awarded
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

This project concerns the renovation and restoration of the monumental platform canopy in Middelburg by ProRail. The focus lies on preserving historical value through the use of specific techniques for constructions from before 1951.

Works · Restricted · National procedure

Contracting authority
Contract type
Works
Restricted
Estimated value
€2,470,000
awarded value
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Renovation of the monumental platform canopy of platform 1 in Middelburg, including dismantling, restoration, and reinforcement according to STABU classification.

This tender focuses specifically on the renovation of the monumental platform canopy of platform 1. The works include dismantling, restoring, and returning the platform canopy to its original state, using authentic materials and techniques that comply with monument care requirements. The objective is to preserve the historical value and integrity of the platform canopy while strengthening the construction and preparing it for future use. The execution period runs from 2025 to 2027. The works within this contract fall under the STABU classification and require a meticulous approach that meets t

45200000Works

02Outcome

Awarded

Anton Rail & Infra B.V.

Award value
€2,470,000
Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure demonstrable expertise in monumental heritage and historical constructions. Optimize the CO2-Prestatieladder to realize a fictitious discount on the tender sum. Verify whether the technical experience specifically relates to objects from before 1951.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 3
Use of authentic materials and techniques for monument care is required.Important
The works require specific experience with old construction methods from before 1951.Important
The tender sum must be substantiated in the budget.Important

05Can I take part?

Technical — Experience with working on, dismantling, and restoring steel and cast iron constructions from before 1951.

06Award criteria

Sustainability: CO2-prestatieladderweight n/a

Quality value is calculated via a fictitious discount percentage on the tender sum based on the indicated CO2 ambition level (step 1 to 5).

Price (for UAV)weight n/a

The best price-quality ratio is determined by the lowest evaluation price, whereby the tender sum is adjusted with a fictitious discount based on the CO2-Prestatieladder.

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Bidders in this segment

#Likely bidderFitWins
1Anton Rail & Infra B.V.SME9521×
2BAM Infra B.V.SME9477×
3Hegeman Bouw & Infra B.V.SME9431×
4Heijmans Infra B.V.SME9365×
5Dura Vermeer Infra Regionale Projecten BVSME9358×
6KWS Infra B.V.SME9292×

09Tender documents

TN476583 - EF30 Aankondiging gegunde opdracht - sectorale richtlijn, standaardregeling 20250320075324pdfMar 20, 2025 · 9 KB
NvI selectiefase Middelburg 2.0pdfAug 16, 2024 · 17 KB
NvI selectiefase 1.0zipAug 13, 2024 · 29 KB
Selectieleidraad TN476583zipJul 13, 2024 · 2509 KB
TN476583 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20240711152243pdfJul 13, 2024 · 13 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the specific nature of the works for the platform canopy in Middelburg?
The works include dismantling, restoring, and returning the monumental platform canopy of platform 1 to its original state. This utilizes authentic materials and techniques that comply with monument care requirements to preserve historical value and integrity.
Under which classification do the works fall?
The works within this contract fall under the STABU classification and require a meticulous approach that meets the strict requirements for the preservation of monumental heritage.
What is the planned execution period of the project?
The execution of the renovation is planned for the period from 2025 up to and including 2027, with a specific duration from 22 January 2025 up to and including 2 July 2027.
Why is the year 1951 relevant to the experience requirement?
The year 1951 marks a significant change in construction techniques and materials in the Netherlands. Constructions from before 1951 are accepted because they possess specific technical and historical characteristics that are relevant to the execution of this monumental project.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 2,5 mln

Gegunde waarden in CPV 45 · werken n=3159