ClosedWorksRestrictedGreen

Stations - Groningen Noord - accessibility realization of ramps

ProRail B.V. · Restricted · 1 lots · 353756
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

Realization of ramps and adjustments to the bicycle parking at Groningen Noord station, where the best price-quality ratio is assessed based on price, CO2 performance ladder, and MKI value.

Works · Restricted · National procedure

Sustainability countsComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPrampscable routebicycle parking

01What is being requested

The work includes the realization of ramps and the relocation of a cable route at Groningen Noord station, including civil engineering works for bicycle parking.

The work concerns the construction of ramps including the relocation of a cable route at Groningen Noord station as part of the Accessibility stations programme and the expansion of the bicycle parking with 328 spaces. It the work consists of the following components: 1. Civil engineering works for ramps and bicycle parking 2. Relocation of cable route for which an authorized ProRail party must be engaged. A provisional sum for these works is included in the contract. The supply and installation of materials for bicycle parking are carried out by a third party.

45000000Works
1Stations - Groningen Noord - accessibility realization of ramps

02Strategic insight

Strategic insight · AI analysis
During calculation, focus on maximizing the fictitious discount by achieving a high CO2 ambition level and a low MKI value. Use the calculation program DuboCalc to accurately determine the environmental effects of material choices. Take the provisional sum for the works around the cable route into account.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 3
An authorized party of ProRail must be engaged for the relocation of the cable route.Important
The supply and installation of materials for bicycle parking is carried out by a third party.Important
The tender sum must be substantiated in the budget.Important

04Award criteria

Sustainability: CO2 performance ladderweight n/a

A fictitious discount on the tender sum based on the indicated CO2 ambition level (level 1 to 5).

Sustainability: Material use (MKI)weight n/a

A fictitious discount on the tender sum when the submitted MKI value is lower than the reference MKI, calculated via a linear distribution.

Price (for UAV-gc)weight n/a

The best price-quality ratio is determined by the lowest evaluation price, consisting of the tender sum minus the fictitious discounts based on the CO2 performance ladder and MKI.

05Process & timeline

Requests for additional information
24/10/2024 13:00 +02:00
Deadline for receipt of requests to participate
08/11/2024 13:00 +01:00
Expected date of dispatch of invitations
21/11/2024
Start date
24/01/2025
End date of the duration
31/12/2025

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Likely competitors

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME9931×
2KWS Infra B.V.SME9792×
3Dura Vermeer Infra Regionale Projecten BVSME9758×
4BAM Infra B.V.SME9777×
5Anton Rail & Infra B.V.SME9721×
6Heijmans Infra B.V.SME9565×

08Tender documents

Selectieleidraad Groningen Noord HellingbanenzipOct 17, 2024 · 2282 KB
TN459070 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20241017142323pdfOct 17, 2024 · 11 KB

09Legal themes that may be relevant here

10Frequently asked questions

What exactly does the assignment for station Groningen Noord entail?
The assignment includes the construction of ramps and the expansion of the bicycle parking with 328 spaces. This work consists of civil engineering works for the ramps and bicycle parking, as well as the relocation of a cable route.
How is the relocation of the cable route carried out?
An authorized ProRail party must be engaged for the relocation of the cable route. A provisional sum has been included in the contract for this purpose.
Who is responsible for the materials of the bicycle parking?
The supply and installation of the materials for the bicycle parking are carried out by a third party.
What is the intended timeframe for the works?
The execution of the assignment is planned with a start date of 24/01/2025 and an end date of 31/12/2025.
On which criterion is the assignment awarded?
The award takes place based on the Price criterion (for UAV-gc).

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159