ClosedWorksRestrictedGreen

Stations - Den Haag - Stichthage bicycle storage

ProRail B.V. · Restricted · 1 lots · 337686
Type
Works
45200000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

Optimization and renewal of the bicycle storage under Stichthage station in Den Haag, including civil engineering and installation technical works.

Works · Restricted · National procedure

Sustainability counts1 exclusion groundsComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPP

01What is being requested

The project concerns the optimization of the Stichthage bicycle storage in Den Haag by means of civil engineering works and the adjustment of installations. The works include, among other things, the removal of a raised floor and partition wall, improving access, and renewing the entire layout including lighting and security.

***short description of works***

45200000Works
1Stations - Den Haag - Stichthage bicycle storage

02Strategic insight

Strategic insight · AI analysis
Ensure that the reference projects comply exactly with the minimum value requirements for both civil engineering and installations. Optimize the CO2 ambition to obtain a maximum fictitious discount on the evaluation price. Check whether all subcontractors possess the required certifications.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 3
The location is the basement storage under Stichthage, not the bicycle building at the Rijnstraat.Important
In the case of a combination of parties, all members of the combination and subcontractors must comply with the ISO and VCA requirements.Important
The CO2 performance ladder is used as a fictitious discount on the tender sum.Important

04Can I take part?

Technical · 4
E3 Technical and organizational competence; Quality ISO 9001: the candidate must comply with the standards regarding quality control (EN-ISO 9001: 2015).Technical
E4 Technical and organizational competence; Safety VCA**: the candidate must possess a VCA** certificate or equivalent measures.Technical
E5 Experience requirement WORKS I: demonstrable experience in realizing civil engineering works at stations with 1 reference project of at least € 1,000,000.Technical
E6 Experience requirement WORKS II: demonstrable experience in realizing installation works at a railway station with a minimum value of € 400,000.Technical
Exclusion ground · 1
E2 Exclusion criteria: exclusion in accordance with article 2.86 or 2.87, paragraph 1 of the Public Procurement Act 2012 (Aanbestedingswet 2012).Exclusion ground

05Exclusion grounds

Exclusion grounds (1)
  • E2 Exclusion criteria: exclusion in accordance with article 2.86 or 2.87, paragraph 1 of the Public Procurement Act 2012 (Aanbestedingswet 2012).

06Award criteria

Sustainability: CO2 performance ladder10

Quality value based on the indicated CO2 ambition level (step 1 to 5) with corresponding fictitious discount percentages.

Price (for UAV-gc)90

The lowest evaluation price is determined by the tender sum minus the fictitious discount based on the CO2 Performance Ladder.

07Process & timeline

requests for additional information
14/06/2024 12:00 +02:00
deadline for receipt of requests to participate
27/06/2024 09:00 +02:00
expected date of dispatch of invitations
26/08/2024
start date
07/11/2024
end date
15/12/2025

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9792×
2Hegeman Bouw & Infra B.V.SME9731×
3BAM Infra B.V.SME9677×
4Dura Vermeer Infra Regionale Projecten BVSME9558×
5Anton Rail & Infra B.V.SME9521×
6Van Gelder BVSME9453×

10Tender documents

Nota van inlichtingen 2024-06-17-1pdfJun 17, 2024 · 3 KB
aankondiging TN447320zipMay 28, 2024 · 2154 KB
TN447320 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20240528140848pdfMay 28, 2024 · 12 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the technical objective of the works at the Stichthage bicycle storage?
The objective is to make the storage comply with the recent design regulations and to improve functionality. This includes removing a raised floor for extra bicycle racks, removing a partition wall for better visibility, improving access, and adjusting various installations, including connection to the Fides network.
Which new facilities are being added to the bicycle storage?
The entire layout is being renewed and missing assets are being added, namely: lighting, DFPS, CCTV, HBF, Signing, InfoPlus, and a clock system.
What is the expected execution period of the assignment?
The execution of the works is planned with a start date of 07-11-2024 and an end date of 15-12-2025.
Which specific location does the Stichthage bicycle storage refer to?
It concerns the basement storage under Stichthage with the entrance at Rijnstraat/Koningin Juliaplein, and not the bicycle building at Rijnstraat 8.
How is the selection of candidates carried out?
ProRail does not perform a selection; if a candidate meets the minimum suitability requirements, they may participate in the tender.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159