ClosedWorksEuropeanRestricted

Demolition and new construction of Hart van Opwierde Cluster II

Type
Works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Ministry of Economic Affairs and Climate Policy has announced an awarded contract for the demolition and new construction of the Hart van Opwierde Cluster II. The project includes the complete removal of existing structures, ground and foundation preparation, and the construction of new facilities that comply with current building and environmental standards. The contracting authority requires a party with extensive experience in both demolition and new construction projects, knowledge of Dutch regulations, and a strong safety and environmental management plan. The procedure is non-public, meaning the tender was not publicly advertised. The contract focuses on sustainable and efficient execution, with attention to energy efficiency and minimal disruption to the surroundings. The selected contractor must be able to deliver within the specified time and budget, with a focus on quality and compliance.

Works · Restricted · European procedure

European
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksEU tenderdemolitionnew constructionHart van Opwierde

01What is being requested

The Ministry of Economic Affairs and Climate Policy has announced an awarded contract for the demolition and new construction of the Hart van Opwierde Cluster II. The project includes the complete removal of existing structures, ground and foundation preparation, and the construction of new facilities that comply with current building and environmental standards. The contracting authority requires a party with extensive experience in both demolition and new construction projects, knowledge of Dutch regulations, and a strong safety and environmental management plan. The procedure is non-public, meaning the tender was not publicly advertised. The contract focuses on sustainable and efficient execution, with attention to energy efficiency and minimal disruption to the surroundings. The selected contractor must be able to deliver within the specified time and budget, with a focus on quality and compliance.

This concerns the announcement of an awarded contract.

Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Bouwgroep Dijkstra Draisma potentialUnknown37
2Dusseldorp Infra, Sloop en Milieutechniek B.V. potentialSME35
3Bnext.nl Sloopwerken B.V. (voorheen Beelen.nl) potentialSME35
4Heembouw Kantoren B.V. potentialSME35
5Locus People Nederland potentialUnknown35
6RPS advies- en ingenieursbureau B.V. potentialSME35

05Legal themes that may be relevant here

06Frequently asked questions

What does the contract for Hart van Opwierde Cluster II entail?
The contract includes the demolition and new construction of the Hart van Opwierde Cluster II, including the complete removal of existing structures, ground and foundation preparation, and the construction of new facilities.
What requirements must the execution of the works meet?
The new construction must comply with current building and environmental standards, with a focus on energy efficiency, a strong safety and environmental management plan, and minimal disruption to the surroundings.

Automatically compiled from the official tender data and documents.