CancelledWorksEuropeanRestricted

Selection of executing parties for new construction of sports center Delft

Koninklijke Sportfondsen Nederland B.V. · Restricted · 1 lots · 397570
Type
Works
45200000
Estimated value
Not published
To deadline
-129d
Feb 13, 2026 · 12:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

This tender concerns the realization of a new sports center in Delft with associated residential construction. The contract will be awarded on the basis of the best price/quality ratio.

Works · Restricted · European procedure

EuropeanComplete timeline
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
February 13, 2026
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Realization of a new sports center in Delft, including the demolition of a school, the construction of a sports hall with swimming facilities and a parking garage, plus the development of approximately 30 dwellings.

This EU non-public procurement is initiated for the realization of a new Sportcentrum in Delft. The scope of the project includes the demolition of an old school, the construction of a sports hall with swimming facilities and a parking garage. Furthermore, development rights are granted for the design, realization, and operation (sale or rental) of approximately 30 dwellings at the contractor's own expense and risk. The tender is aimed at selecting an executing party for the realization of the entire project.

45200000Works
1No lots

02Strategic insight

Strategic insight · AI analysis
Focus on the price/quality ratio during the tender phase. Ensure that the suitability requirements are fully demonstrated in the first phase to be among the 5 selected parties. Take the own risk into account regarding the development of the dwellings.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 3
The procedure is a non-public procurement.Important
A selection phase takes place in which a maximum of 5 parties will be invited.Important
The development of dwellings is carried out at the own expense and risk of the contractor.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Award criteria

Best Price/Quality Ratio with Award based on Valueweight n/a

The award takes place on the basis of the best price/quality ratio.

06Process & timeline

Contract announcement
06/01/2026
Requests to participate received
13/02/2026 12:00 +01:00
Requests for additional information
22/01/2026 08:30 +01:00
Dispatch of invitations to tender
10/03/2026
Start date
20/07/2026
End date
20/07/2028

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9558×
2Hegeman Bouw & Infra B.V.SME9531×
3BINX Smartility B.V.SME9427×
4BAM Bouw en Techniek bvSME9134×
5K_Dekker bouw & infra B.V.SME8922×
6Heijmans Utiliteit B.V.SME8927×

09Tender documents

TN524774 - EF07 Vooraankondiging gebruikt om termijnen voor ontvangst van inschrijvingen te verkorten - algemene richtlijn 20251017225923pdfOct 19, 2025 · 9 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the exact scope of the works for the sports center in Delft?
The scope includes the demolition of an old school, the construction of a sports hall with swimming facilities and a parking garage. Additionally, development rights are granted for the design, realization, and operation (sale or rental) of approximately 30 dwellings at the contractor's own expense and risk.
How does the selection procedure for this contract proceed?
The procedure starts with a selection phase in which parties that meet the suitability requirements are invited. If more than 5 suitable parties apply, a selection will take place based on selection criteria to select a maximum of 5 parties for the subsequent tender phase.
On what criterion will the final contract be awarded?
During the tender phase, the contract will be awarded to the bidder offering the best price/quality ratio, assessed on the basis of the established award criteria.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159