OpenServicesEuropeanRestrictedGreen

Selection of design team for new construction Copernicus & Sports Hall - Dronten

Almere College · Restricted · 2 lots · 422715
Type
Services
71000000 · Services related to ar
Estimated value
Not published
To deadline
-21d
May 26, 2026 · 12:00
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

Selection procedure for the design team of the new construction Copernicus and a sports hall in Dronten, divided into two lots. The procedure consists of a selection phase (phase 1) followed by an award phase (phase 2) based on the best price-quality ratio.

Services · Restricted · European procedure

Sustainability countsEuropean1 exclusion groundsComplete timeline
Contracting authority
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
May 26, 2026
12:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Services related to architecture, building construction, civil engineering and inspection
Location
Netherlands
CharacteristicsCPV 71ServicesEU tenderGreen / SPP

01What is being requested

The contract concerns the selection of a design team for the new construction of the Copernicus and a sports hall with a total scope of approx. 9,550 m2 GFA. The contract is divided into two lots: Lot 1 (architect and structural engineer) and Lot 2 (technical installations and building physics advisor).

New construction for the Copernicus of the Almere College with a scope of approx. 6,200 m2 GFA and a sports hall and gymnasium of approx. 3,350 m2.

71000000Services
1Lot 1 - architecture, building construction, structural engineering and landscaping
2Lot 2 - technical installations, building physics, acoustics and fire safety

02Breakdown by lot

Lot 1 - architecture, building construction, structural engineering and landscapingn/a
Lot 2 - technical installations, building physics, acoustics and fire safetyn/a

Per-lot values not published — bars show only the lot breakdown.

03Strategic insight

Strategic insight · AI analysis
Ensure a complete application in accordance with the mandatory attachments (Annex 2, 3, 4, 5 and possibly 6) to prevent exclusion. When forming a combination or relying on third parties, strictly observe the rules regarding prime and subcontractor responsibility and the required third-party statement(s). Prepare for the award phase where the focus lies on the Best Price-Quality Ratio, including vision, sustainability and organization.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 5
The deadline for applications is a strict deadline.Important
All communication must take place exclusively via TenderNed.Important
Additional documentation is not desired and will not be considered.Important
If a partnership is used, the combining parties must submit a joint application.Important
In the event of an equal score in the selection phase, the ranking is determined by selection criterion 5 (architectural competence).Important

05Can I take part?

Exclusion ground — The grounds for exclusion for Lot 1 and 2 must not apply in accordance with the completed Uniform European Procurement Document (UEA).
Technical — Candidates must meet the minimum suitability requirements as stated in chapter 3.

06Exclusion grounds

Exclusion grounds (1)
  • The grounds for exclusion for Lot 1 and 2 must not apply in accordance with the completed Uniform European Procurement Document (UEA).

07Award criteria

Best Price-Quality Ratioweight n/a

The award criterion where both the price and the offered qualitative aspects are weighed. The sub-award criteria are: Vision on the assignmentInventiveness and sustainabilityOrganization, collaboration and communicationFee based on draft agreement

08Process & timeline

Start tender
23 april 2026
Deadline and time for submitting questions via TenderNed
6 mei 2026 voor 12:00 uur
Publication of Memorandum of Information via TenderNed
13 mei 2026
Deadline and time for submission of Applications via vault in TenderNed
26 mei 2026 voor 12:00 uur
Announcement of selection phase results via TenderNed (intention to select)
5 juni 2026
Start phase 2 - award phase
17 juni 2026
Deadline and time for submitting questions via TenderNed
1 juli 2026 voor 12:00 uur
Publication of Memorandum of Information via TenderNed
8 juli 2026
Deadline and time for submission of Tenders via vault in TenderNed
21 augustus 2026 voor 12:00 uur
Presentations
25 augustus 2026

09Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

10Likely competitors

#Likely bidderFitWins
1Aveco de Bondt BVSME9819×
2Arcadis Nederland B.V.SME97151×
3BDG Architecten Ingenieurs Zwolle B.V.SME9515×
4Nelissen ingenieursbureau b.v.SME9421×
5Deerns Nederland B.V.SME9420×
6abcnova B.V.SME9318×

11Tender documents

TN585716 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20260423152208pdfApr 25, 2026 · 243 KB
Bijlage 2_4_5_6 in worddocxApr 25, 2026 · 75 KB
uea_585716_20260423144212pdfApr 25, 2026 · 600 KB
Selectieleidraad Copernicus & Sporthal - 20260423pdfApr 25, 2026 · 1799 KB

12Legal themes that may be relevant here

13Frequently asked questions

What expertise and experience are required for participation?
Bidders must have documented expertise in the fields of architecture, building construction, technical design, acoustics, fire safety and building physics. Precedent projects of similar scale (approx. 6,000-7,000 m²) in a public building or educational environment are also required.
What is the size of the buildings to be realized?
The contract concerns the new construction of the Copernicus building with a size of approximately 6,200 m2 GFA and a sports hall with three hall sections and a gymnasium with a combined size of approximately 3,350 m2 GFA.
What specific knowledge is needed for the technical component?
For the technical component, expertise is required in the fields of technical installations, building physics, acoustics and fire safety for the new construction of the Copernicus building and the associated sports facilities.
Under which legal frameworks must the contract be executed?
Execution must comply with Dutch building regulations and EU contract law. In addition, measures are required for providing municipal building support and architectural design.

Automatically compiled from the official tender data and documents.

14Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713