ClosedServicesEuropeanOpen

SBIR “Satellite data use for the daily estimation of nationwide evaporation information on cloudy days”

Type
Services
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The SBIR tender from the Ministry of Economic Affairs (known as 'SBIR – Satellite data use for the daily estimation of nationwide evaporation information on cloudy days') calls on entrepreneurs to develop innovative satellite methods to estimate evaporation and the deficit at grid locations (ideally 100×100 m, minimum 250×250 m). The tender consists of two phases: a feasibility study (Phase 1) and a prototype/demonstration project (Phase 2).

Services · Open · European procedure

European
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
17:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVServicesEU tender

01What is being requested

The SBIR tender from the Ministry of Economic Affairs (known as 'SBIR – Satellite data use for the daily estimation of nationwide evaporation information on cloudy days') calls on entrepreneurs to develop innovative satellite methods to estimate evaporation and the deficit at grid locations (ideally 100×100 m, minimum 250×250 m). The tender consists of two phases: a feasibility study (Phase 1) and a prototype/demonstration project (Phase 2).

STOWA/SAT-WATER (a partnership of several water boards focusing on opportunities for Remote Sensing within water management), together with the Netherlands Space Office (NSO), challenges entrepreneurs to develop new methods based on satellite data that contribute to improving the daily estimation of nationwide evaporation information on cloudy days. This concerns the actual evaporation and the evaporation deficit for a scale of at least 250x250m, but preferably 100x100m. Insight is requested per grid cell regarding the mean and the standard deviation, the latter serving as a measure of accurac

Services

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1KWR Water B.V. potentialSME35
2Geoserve B.V. potentialSME34
3SkyGeo Netherlands B.V. potentialSME34
4Sensar B.V. potentialSME34
5H. de Vos Elektrotechniek Mijdrecht B.V. potentialSME34
6Eijkelkamp Soil and Water potentialUnknown33

05Tender documents

SBIR Verdampingsinformatie infobijeenkomst_RamonPeeters_NSOpdfNov 14, 2016 · 1428 KB
SBIR info procedure SAT-WATER MHpdfNov 14, 2016 · 595 KB
SAT-WATER9nov2016pdfNov 14, 2016 · 2376 KB
Nota van inlichtingen - SBIR-VerdampingsinformatieV DEFpdfNov 14, 2016 · 167 KB
SBIR Oproep SatWater_publicatie_DefpdfOct 31, 2016 · 73 KB
SBIR handleiding voor ondernemers 1.0 juli 2015docxOct 24, 2016 · 100 KB
TN119234 - SF02 Aankondiging van een opdracht 20161024114310pdfOct 24, 2016 · 21 KB
SBIR-formulier fase 1 en 2_2015-2docxOct 24, 2016 · 90 KB
SBIR Model Projectplan fase 1 in format nov 2015docxOct 24, 2016 · 76 KB
Model Begroting fase 1docOct 24, 2016 · 45 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the objective of this SBIR assignment?
The objective is to develop new methods based on satellite data for improving the daily estimation of nationwide evaporation information on cloudy days. This involves looking at the actual evaporation and the evaporation deficit.
What scale requirements must the evaporation information meet?
The estimation of the actual evaporation and the evaporation deficit must take place at a scale of at least 250x250m, with a preference for a scale of 100x100m.
What information is requested per grid cell?
Per grid cell, insight is requested into the mean and the standard deviation, where the standard deviation serves as a measure of the accuracy of the estimation.
What phases does the innovation process consist of?
The assignment is composed of two phases: the best ideas receive a contract for a feasibility study (SBIR phase 1), and the best feasibility studies receive a follow-up contract for the development and demonstration of a prototype (SBIR phase 2).
What is the background of the funding for this assignment?
The financial resources for this SBIR come from the national flanking space policy of the Ministry of Economic Affairs.

Automatically compiled from the official tender data and documents.