Retrofit substation measuring system
Alliander N.V. intends to install measuring systems in 1,800 fields of 150 switchgear installations across 100 existing 10, 20, and 50kV stations to gain insight into the power flows of the electricity grid. The contract concerns the supply of a uniform retrofit solution that is applicable to various configurations, can be installed safely without decommissioning, and is suitable for long-term maintenance. The solution must meet technical requirements for measurement accuracy, reliability, and integration with existing SCADA/OMS systems, and must comply with safety and regulatory standards. The contracting authority is looking for a supplier with experience in electrical installations, measurements, and retrofit projects within the energy grid.
Supplies · Onderhandeling zonder bekendmaking · European procedure
01What is being requested
Alliander N.V. intends to install measuring systems in 1,800 fields of 150 switchgear installations across 100 existing 10, 20, and 50kV stations to gain insight into the power flows of the electricity grid. The contract concerns the supply of a uniform retrofit solution that is applicable to various configurations, can be installed safely without decommissioning, and is suitable for long-term maintenance. The solution must meet technical requirements for measurement accuracy, reliability, and integration with existing SCADA/OMS systems, and must comply with safety and regulatory standards. The contracting authority is looking for a supplier with experience in electrical installations, measurements, and retrofit projects within the energy grid.
The energy transition makes it necessary for Alliander to gain more insight into the precise power flows passing through the electricity grid. To achieve this, it is necessary to install measuring systems in the short term in over 1,800 fields of 150 switchgear installations distributed across 100 existing 10, 20, and 50kV station locations. With a view to manufacturability and long-term maintainability, Alliander is looking for a single solution that is applicable in various configurations at all intended locations and can be installed safely without taking installations out of service.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of the substation retrofit?
At which locations and voltages will the measuring systems be installed?
Which technical requirements must the retrofit solution meet?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 300K
€ 515K
€ 1,7 mln
Gegunde waarden in CPV 38 · leveringen n=331