ClosedWorksRestricted

Request for Qualifications: Saba Renewable Energy Phase 3 Project - Solar PV with Battery Energy Storage System Engineering, Procurement and Construction for Saba Electric Company

Saba Electric Company N.V. · Restricted · 1 lots · 354925
Type
Works
45262640
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Saba Electric Company N.V. (SEC) is launching a Request for Qualifications (RfQ) for Engineering, Procurement and Construction (EPC) of a utility-scale, ground-mounted solar PV installation with a battery energy storage system (BESS). The project, located on a 34,530 m² area in Giles Quarters, Saba, has an estimated capacity of 2 MW PV and 7.2 MWh BESS. The interconnection with the local grid can be achieved by extending the existing Feeder #3 by 1 km or by installing a new 2–3 km 12 kV line from Feeder #4. The RfQ is a non-public procedure aimed at selecting a qualified EPC partner with experience in similar projects, local regulations, and providing a fully integrated solution including design, procurement, construction, testing, and commissioning. SEC expects detailed qualification documentation, references, technical and financial capacity, and a clear approach to project management, safety, and environmental compliance.

Works · Restricted · National procedure

Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
23:59
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Workssolar PVbattery storageSaba

01What is being requested

Saba Electric Company N.V. (SEC) is launching a Request for Qualifications (RfQ) for Engineering, Procurement and Construction (EPC) of a utility-scale, ground-mounted solar PV installation with a battery energy storage system (BESS). The project, located on a 34,530 m² area in Giles Quarters, Saba, has an estimated capacity of 2 MW PV and 7.2 MWh BESS. The interconnection with the local grid can be achieved by extending the existing Feeder #3 by 1 km or by installing a new 2–3 km 12 kV line from Feeder #4. The RfQ is a non-public procedure aimed at selecting a qualified EPC partner with experience in similar projects, local regulations, and providing a fully integrated solution including design, procurement, construction, testing, and commissioning. SEC expects detailed qualification documentation, references, technical and financial capacity, and a clear approach to project management, safety, and environmental compliance.

Saba Electric Company N.V. (SEC) is issuing this Request for Qualifications for interested parties to provide information to qualify for an upcoming tender for Engineering, Procurement, and Construction services for a utility-scale ground-mounted solar PV plant with battery energy storage system (BESS) project at Giles Quarters, Saba. The approximate plant capacities are 2MW solar and 7.2MWh BESS. The proposed Phase 3 solar PV with BESS renewable energy plant will be located on a 34,530 square meter site at Giles Quarter. It will be interconnected to the Saba grid either by extending existing

45262640Works
1Solar PV with Battery Energy Storage System Engineering, Procurement and Construction for Saba Electric Company

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME8477×
2SPIE Nederland B.V.SME8124×
3De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME7926×
4BAM Bouw en Techniek bvSME7834×
5Heijmans Utiliteit B.V.SME7827×
6Eneco Zakelijk B.V.SME7712×

04Tender documents

TN493555 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20241026000956pdfOct 27, 2024 · 11 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the technical scope of the solar energy project?
The project concerns a utility-scale, ground-mounted solar PV installation with an estimated capacity of 2 MW PV and a battery energy storage system (BESS) of 7.2 MWh.
What does the requested assignment for the EPC partner entail?
The assignment includes Engineering, Procurement and Construction (EPC) services, including the design, procurement, construction, testing, and final commissioning of the installation.
How will the solar energy installation be connected to the electricity grid?
The interconnection with the local grid can take place by extending the existing Feeder #3 by 1 km or by installing a new 12kV line of 2 to 3 km from the SEC Power Station (Feeder #4).

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159