Renovation, sustainability and expansion of Groenoord swimming pool
This tender concerns the renovation, sustainability and expansion of Groenoord swimming pool for an estimated assignment sum of € 7.25 million. The award takes place on the basis of quality within a fixed budget.
Works · Restricted · European procedure
01What is being requested
The assignment concerns the renovation, sustainability and expansion of Groenoord swimming pool in Schiedam. The total assignment sum is estimated at € 7,250,000.
Zwembad Groenoord is a sports and recreation swimming pool with a sunbathing area, play paradise, catering, and in addition, space for sports other than swimming. The swimming pool has a 6-lane 25-meter competition pool with a diving board for, among other things, swimming lessons and competitions, a recreation pool with a 65-meter long slide, waterfall, plunge pool, jacuzzi, two bubble baths, and a toddler and preschool pool with a small slide. The Assignment comprises the execution of the renovation, sustainability and expansion of the Groenoord swimming pool. Due to the su
02Outcome
Vaessen Algemeen Bouwbedrijf B.V.
03Strategic insight
When submitting your bid, focus entirely on quality, as the price is a fixed budget. Ensure that the SROI obligation is correctly processed based on the wage bill. Note that the bank guarantee should only be provided upon award.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
Assessment of the quality of the bid.
Fixed task-oriented budget.
08Process & timeline
09Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
10Bidders in this segment
11Tender documents
12Legal themes that may be relevant here
13Frequently asked questions
What is the content of the assignment for Zwembad Groenoord?
Which facilities are part of the current swimming pool?
What is the goal of the sustainability of the location?
Automatically compiled from the official tender data and documents.
14Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159