Renovation of technical facilities Theater aan het Spui
Renovation of the technical facilities in the Theater aan het Spui, planned for the summer of 2017. The procurement was conducted via an open procedure, applied under the uniform general conditions UAV 2012. There are no specific preferences for brands, types, or manufacturers, but the requirements focus on safety, working environment, and functional specifications.
Supplies · Open · European procedure
01What is being requested
Renovation of the technical facilities in the Theater aan het Spui, planned for the summer of 2017. The procurement was conducted via an open procedure, applied under the uniform general conditions UAV 2012. There are no specific preferences for brands, types, or manufacturers, but the requirements focus on safety, working environment, and functional specifications.
The theatre technical facilities in the Theater aan het Spui must be renovated in the summer of 2017. This request therefore includes the theatre technical facilities as they must be designed, built, installed, and delivered ready for use by the contractor of the theatre technical installations. The work will be carried out under the application of the uniform general conditions UAV 2012. The work mainly comprises the renovation of the theatre technical facilities. Adjustments to the electrotechnical and mechanical engineering installations are described separately as lots to be tendered indiv
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the scope of the contract for the renovation of the Theater aan het Spui?
Which general conditions apply to the execution of the works?
Are there specific requirements for brands or manufacturers?
When must the technical facilities be realized?
Automatically compiled from the official tender data and documents.