AwardedWorksEuropeanOpen

Renovation Main Sewer Oss Construction Team (Phase 3)

Waterschap Aa en Maas · Open · 1 lots · 191740
Type
Works
45259100
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the renovation and 'relining' of a 1,650 m² section of a concrete culvert that carries wastewater from Oss to the RWZI Oijen. The pipeline, cast in 1967, has internal dimensions of 2,450 x 1,650 mm and a wall and floor thickness of 250 mm. The free fall runs over 4.2 km with a height difference of only three meters, resulting in a very small gradient. After renovation, the original capacity and free flow must be maintained. The project will be carried out via an open procedure. The contracting authority is Waterschap Aa en Maas. The works require a precise finish, material selection resistant to long-term exposure to wastewater, and minimal interruption of the water flow.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
11:59
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
's-Hertogenbosch
CharacteristicsCPV 45WorksEU tenderRenovationMain SewerOss

01What is being requested

The tender concerns the renovation and 'relining' of a 1,650 m² section of a concrete culvert that carries wastewater from Oss to the RWZI Oijen. The pipeline, cast in 1967, has internal dimensions of 2,450 x 1,650 mm and a wall and floor thickness of 250 mm. The free fall runs over 4.2 km with a height difference of only three meters, resulting in a very small gradient. After renovation, the original capacity and free flow must be maintained. The project will be carried out via an open procedure. The contracting authority is Waterschap Aa en Maas. The works require a precise finish, material selection resistant to long-term exposure to wastewater, and minimal interruption of the water flow.

The work concerns the renovation and 'relining' of a section (approximately 1,650 m¹) of a large concrete discharge culvert that transports wastewater from the city of Oss to the rwzi Oijen. This discharge pipeline is constructed as a concrete culvert, cast in situ, and dates from approximately 1967 with internal dimensions of 2,450 x 1,650 mm (WxH) and a wall and floor thickness of 250 mm. The wastewater is led under free fall, therefore without a pumping station, from the takeover point at the Brabantlaan to the rwzi Oijen. The free-fall main sewer lies almost in a straight line and has a pa

45259100Works
1Lot 1

02Outcome

Awarded

GW Leidingtechniek BV

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Van Gelder BVSME9853×
2KWS Infra B.V.SME9792×
3Boskalis Nederland B.V.SME9769×
4ENGIE Infra & Mobility B.V.SME9769×
5Heijmans Infra B.V.SME9765×
6BAM Infra B.V.SME9677×

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the renovation works on the concrete culvert?
The assignment concerns the renovation and relining of approximately 1,650 m¹ of a concrete discharge culvert that transports wastewater from Oss to the rwzi Oijen.
What are the technical specifications of the existing discharge pipeline?
The discharge pipeline is a cast-in-situ concrete culvert from circa 1967 with internal dimensions of 2,450 x 1,650 mm (WxH) and a wall and floor thickness of 250 mm.
What requirements are made regarding the discharge capacity after renovation?
After the renovation of the culvert, the original discharge capacity must be maintained.
How is the fall of the discharge pipeline regulated?
The wastewater is led under free fall, without a pumping station. Over the total length of approx. 4.2 km, the culvert drops only approximately three meters, which results in a particularly small gradient.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159