ClosedWorksOpenGreen

Renovation Snelle sluis

Type
Works
45240000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Hoogheemraadschap van Schieland en de Krimpenerwaard wishes to renovate the Snelle sluis as part of the maintenance of the waterways in the area. The lock is a crucial hub for water displacement and shipping, meaning the renovation must comply with strict safety and environmental standards. The works include structural repairs to the lock gate, replacement of hydraulic and electrical components, and improving watertightness and access facilities. The procurement is an open procedure, allowing all interested parties an equal opportunity to submit a tender. Execution must ensure minimal disruption to water traffic and must be completed within a set timeframe. The contracting authority expects a technically sound, cost-efficient, and sustainable solution, prioritizing the quality of water management and safety for users.

Works · Open · National procedure

Sustainability counts
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPlock renovationwater managementwater board

01What is being requested

Hoogheemraadschap van Schieland en de Krimpenerwaard wishes to renovate the Snelle sluis as part of the maintenance of the waterways in the area. The lock is a crucial hub for water displacement and shipping, meaning the renovation must comply with strict safety and environmental standards. The works include structural repairs to the lock gate, replacement of hydraulic and electrical components, and improving watertightness and access facilities. The procurement is an open procedure, allowing all interested parties an equal opportunity to submit a tender. Execution must ensure minimal disruption to water traffic and must be completed within a set timeframe. The contracting authority expects a technically sound, cost-efficient, and sustainable solution, prioritizing the quality of water management and safety for users.

Renovation Snelle sluis

45240000Works
1Renovation Snelle sluis

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9965×
2KWS Infra B.V.SME9792×
3Dura Vermeer Infra Regionale Projecten BVSME9758×
4Boskalis Nederland B.V.SME9669×
5BAM Infra B.V.SME9677×
6ENGIE Infra & Mobility B.V.SME9669×

04Legal themes that may be relevant here

05Frequently asked questions

What is the scope of the assignment for the renovation of the Snelle sluis?
The works include structural repairs to the lock gate, the replacement of hydraulic and electrical components, and improving watertightness and access facilities.
Which criteria are applied regarding sustainability?
Sustainability criteria are applied during the execution of the renovation works for this assignment.
What are the main points of attention during the execution of the works?
Execution must ensure minimal disruption to water traffic and the works must be completed within a set timeframe.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159