OpenServicesEuropeanOpen

Cleaning of catch basins and line drains Stadskanaal

Gemeente Stadskanaal · Open · 1 lots · 425125
Type
Services
90640000 · Services for cleaning
Estimated value
€ 800K
estimated
To deadline
-8d
Jun 8, 2026 · 17:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

This is a European open procedure for the cleaning of catch basins and line drains where the award is based on the lowest price.

Services · Open · European procedure

European
Contracting authority
NL114
Contract type
Services
Open
Estimated value
€800,000
estimated value
Submission deadline
June 8, 2026
17:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Services for cleaning and emptying catch basins
Location
Stadskanaal, NL114
CharacteristicsCPV 90ServicesEU tender

01What is being requested

The contract concerns the cleaning of catch basins and line drains via a framework agreement.

The predictable and planned execution of the cleaning of catch basins and line drains

90640000€ 800KServices
1Cleaning of catch basins and line drains Stadskanaal€800,000

02Strategic insight

Strategic insight · AI analysis
Ensure that the tender is complete and unconditional to prevent exclusion. Submit questions continuously via the platform and not just on the closing date. Note that in the case of a group/concern, the correct declarations must be added.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The tender must be submitted legally signed.Important
Submitting variants is not permitted.Important
A conditional tender is invalid.Important
Tenderers may only submit a tender once.Important
Communication must always take place via the Mercell platform.Important

04Can I take part?

Other — If you are part of a group/concern, you must provide a group declaration in accordance with the annex.

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

lowest priceweight n/a

The procurement procedure is based on the lowest price to arrive at one agreement.

07Value in context

€800,000

08Likely competitors

#Likely bidderFitWins
1CSU B.V.SME100181×
2Vandervalk+degroot B.V.SME10066×
3Veeg- en Rioolbedrijf Adriaans BVSME10025×
4Renewi Nederland B.V.SME97133×
5De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9715×
6AsitoUnknown9768×

09Tender documents

KLACHTENFORMULIER.docxdocxMay 15, 2026 · 35 KB
Procedure.pdfpdfMay 15, 2026 · 78 KB
Beschrijving.pdfpdfMay 15, 2026 · 31 KB
Geschiktheidseisen.pdfpdfMay 15, 2026 · 41 KB
1_Bijlage Bestek_Waarnemingsmogelijkheden Kolkenreinging Mapkit.xlsxxlsxMay 15, 2026 · 18 KB
UITVOERING SOCIAL RETURN 3.0 - 2025.pdfpdfMay 15, 2026 · 325 KB
Inschrijvingsbiljet.pdfpdfMay 15, 2026 · 20 KB
Inschrijvingsfase.pdfpdfMay 15, 2026 · 29 KB
CONCERNVERKLARING.docxdocxMay 15, 2026 · 54 KB
Bijlage MapKit_Handleiding_Kolk_2020.pdfpdfMay 15, 2026 · 2657 KB
Inschrijvingsstaat.pdfpdfMay 15, 2026 · 34 KB
UAV 2012 (2).pdfpdfMay 15, 2026 · 1772 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the nature of the works?
The contract concerns the predictable and planned execution of the mechanical and manual cleaning of catch basins and line drains.
What experience and knowledge are required for tenderers?
Tenderers must have demonstrable experience with waterway maintenance and similar assignments. Additionally, technical knowledge of water and pipe-empty cleaning processes and capacity for planned work and material planning is necessary.
Which mandatory selection requirements must the contractor meet?
A planned approach is required and the contractor must be able to complete the work within the specified period. The contractor must also comply with the security of the involved water sector and social/sustainable standards.
For which period does the agreement apply?
The contract is executed within the framework of a framework agreement for the period 2026-2029.
Which general terms and conditions apply to the execution?
The execution of the works takes place on the basis of the Uniform Administrative Conditions for the execution of works and technical installation works 2012 (UAV 2012, version 2025).

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 214K
median
€ 466K
p75
€ 1,2 mln
€ 800K

Gegunde waarden in CPV 90 · diensten n=2216